Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 91: | Line 91: | ||
<center> <font color=red size=4> <b> Important: Document all your work in the logbook! </b> </font> </center> | <center> <font color=red size=4> <b> Important: Document all your work in the logbook! </b> </font> </center> | ||
− | == RC: | + | == RC: John Jaros (<font size=3>[https://bluejeans.com/656177054 Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm]</font>) == |
* (757) 575-7540 | * (757) 575-7540 | ||
* 9 575 7540 from Counting Room | * 9 575 7540 from Counting Room | ||
Line 100: | Line 100: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == <font color=blue><b> Run Plan for February | + | == <font color=blue><b> Run Plan for February 19 - 22, 2016: </b></font>== |
<!-- == Beam is off and seep starts at 6:45 am on Monday, February 15. == --> | <!-- == Beam is off and seep starts at 6:45 am on Monday, February 15. == --> | ||
− | == Start close-up of the Hall at 3pm on Friday, February | + | == Start close-up of the Hall at 3pm on Friday, February 19 (see "General instruction" on the right) == |
== After hall is in "Beam Permit" turn on the chicane (see "Setting up Chicane for E=2.3 GeV" under "General instructions" on the right) == | == After hall is in "Beam Permit" turn on the chicane (see "Setting up Chicane for E=2.3 GeV" under "General instructions" on the right) == | ||
== Establish beam to the tagger dump (see "General instruction" on the right) == | == Establish beam to the tagger dump (see "General instruction" on the right) == | ||
== Bring beam to FC: == | == Bring beam to FC: == | ||
− | # <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >25 nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged. For orbit lock positions on <font color=red> 2H00(X=~0.,Y=~0.). on 2H02(X=0. | + | # <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >25 nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged. For orbit lock positions on <font color=red> 2H00(X=~0.,Y=~0.). on 2H02(X=-0.7,Y=-1.2). Before bringing beams to the FC, be sure that the SVT and ECal are off, the SVT fully retracted, the target out, and the 2.25 mm SVT collimator is in.</font></b>. All studies should be done with beam currents between 25 nA and 30 nA. |
− | # The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0. | + | # The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.10 mm, and the tilt angle <15 degrees. The spot on the Chromax viewer should be close to x=-2mm, y=-5mm. <b> Do not waste too much time on the initial beam tune, as long as rates on the halo counters are low - Downstream L/R/T/B and HPS-L/R <~few Hz/nA, and HP-SC < few x 10 Hz, the following program still can be done:</b> |
− | #* | + | # SVT Expert resets beam position with SVT wire scan. |
− | # | + | #* run svt wire scan |
− | #* | + | #* have MCC move beam to xwire=0, ywire=0 using upstream correctors and Frascati current |
− | #* for | + | #* confirm beam envelope tilt on OTR |
− | #* | + | #* repeat and record 2H02 harp scan and BPM values. These are the new standards. |
+ | #* repeat scan of the 2.25 mm collimator and re-center it. Record the new position have it entered into the epics data base. | ||
+ | # Restore ECal and Trigger | ||
+ | #* turn on ECal | ||
+ | #* ECal Expert measures pedestals | ||
+ | #* Record FADC rates with and without the 4 um target at 100 nA, then 200 nA. Agree with last weekend? | ||
+ | #* Trigger rate studies (see instructions under "procedures" for trigger on wiki) | ||
+ | #* Trigger/DAQ expert checks trigger rates, DAQ, and deadtime with 200 nA beam on 4 um target. Record: | ||
#*# ''main scaler screen'' | #*# ''main scaler screen'' | ||
#*# ''ecal scaler gui'' | #*# ''ecal scaler gui'' | ||
Line 119: | Line 126: | ||
<!-- #* Check the FSD system (see procedures on the Documentation page). Call Rafayel Paremuzian. | <!-- #* Check the FSD system (see procedures on the Documentation page). Call Rafayel Paremuzian. | ||
--> | --> | ||
− | # | + | # SVT Expert program at 1.5 mm (shifters run beam stability checks in parallel--see below) |
− | #* | + | #* Ensure that BPM 2H02 is stable and FSD system is on (see procedures page; call Rafayel Paremuzian |
− | # | + | if needed for FSD) |
− | #* | + | #* Turn on SVT |
− | #* call | + | #* Move to 1.5 mm |
− | + | #* Time in SVT and record occupancy and latency | |
+ | #* Check tracking and track quality with online monitoring | ||
+ | # Shifters evaluate beam stability (in parallel with SVT Expert program above) | ||
+ | #* Plot and record halo rate histories and BPM 2H02 histories | ||
+ | #* Does beam move at time of trips? How stable is beam in x and y? | ||
+ | #* Which trips are initiated by FSD? | ||
+ | # SVT Commissioning | ||
+ | #* If beams are stable, SVT expert moves SVT to 1.0 and then 0.5 mm, | ||
+ | recording occupancy, latency, data size, and deadtimes. | ||
+ | #* Once at 0.5 mm, record no target run,occupancy and tracking performance,and APV pulse shape timing study | ||
+ | # Survey of Data Taking with Trigger/DAQ expert for run at 200 nA, 4 um, 0.5 mm. | ||
+ | #* Review data rates, trigger rates, data volume, deadtime | ||
+ | #* Select trigger for remaining run. | ||
+ | # Record Data at 200 nA, 4um, 0.5 mm | ||
+ | #* Include 1 hour of FEE trigger | ||
+ | #* Bulk of data with Pairs1 trigger | ||
+ | #* If get several hours worth of data, and it's not too late (= 8PM), call Mike Tiefenbach (if Sunday) or Arne Freyberger (if, miraculouly, it's Saturday) to do improve vertical beam size. | ||
+ | #* If it's too late, take data. | ||
=== Miscellaneous Notes: === | === Miscellaneous Notes: === |
Revision as of 10:29, 19 February 2016
[edit]
HPS 2016 run, February 4 to March 14, weekends only.
Shifts are manned from Friday 3pm to 7am on Monday.
Beam energy 2.3 GeV (1 pass).
Important: Document all your work in the logbook!
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
RC: John Jaros (Bluejeans info for Run Meetings on Thursdays and Fridays at 3pm)
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avagyan
Run Plan for February 19 - 22, 2016:Start close-up of the Hall at 3pm on Friday, February 19 (see "General instruction" on the right)After hall is in "Beam Permit" turn on the chicane (see "Setting up Chicane for E=2.3 GeV" under "General instructions" on the right)Establish beam to the tagger dump (see "General instruction" on the right)Bring beam to FC:
if needed for FSD)
recording occupancy, latency, data size, and deadtimes.
Miscellaneous Notes:
|
General Instructions:Locking up the hall on Fridays
Acceptable Beam Conditions:
Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=2.3 GeV:Note: This requires Beam Permit and NO beam to HPS / Faraday Cup.
SVT Instructions:
ECAL Instructions:
|
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |