Difference between revisions of "The HPS Run Wiki"

From hps run
Jump to navigation Jump to search
Line 121: Line 121:
 
========================= task consequence  =====================
 
========================= task consequence  =====================
 
# Send beam to the tagger dump (look instruction in the right side), when The beam is good, then ask MCC to deGauss the tagger magnet and send beam to the Faraday Cup.
 
# Send beam to the tagger dump (look instruction in the right side), when The beam is good, then ask MCC to deGauss the tagger magnet and send beam to the Faraday Cup.
# Establish a good beam to the Faraday Cup.
+
# Establish a good beam to the Faraday Cup (read carefully "Before sending a beam to the Faraday cup" and "Send beam to the Faraday cup" in the right column).  
 
#* If the beam doesn't go through the FCup. tel MCC operators that they can go to tagger dump first if needed. look at the section "Establishing Physics Quality Beam for HPS" in the right column.
 
#* If the beam doesn't go through the FCup. tel MCC operators that they can go to tagger dump first if needed. look at the section "Establishing Physics Quality Beam for HPS" in the right column.
 
<!--
 
<!--

Revision as of 08:21, 20 July 2019


[edit]


Svtpic.png

Ecalpic.png