===Establishing Physics Quality Beam for HPS:=== | ===Establishing Physics Quality Beam for HPS:=== | ||
# <font color='red'>'''Make sure SVT is retracted and detectors, SVT, Hodoscope and ECAL are OFF.'''</font> | # <font color='red'>'''Make sure SVT is retracted and detectors, SVT, Hodoscope and ECAL are OFF.'''</font> | ||
− | # <b>If beam was off for | + | # <b>If the beam was off for 4 hours or more or in case of troublesome beam tuning, send a beam to the tagger dump:</b> |
#* Check that beam type is set to "Photon" (<tt>HPS_EPICS->Beam->BTA</tt>). | #* Check that beam type is set to "Photon" (<tt>HPS_EPICS->Beam->BTA</tt>). | ||
#* Position "Blank" on the beam for the Hall-B collimator | #* Position "Blank" on the beam for the Hall-B collimator | ||
Line 196: | Line 196: | ||
#* Check the beam position on the tagger viewer, it should be approximately in the center of the screen | #* Check the beam position on the tagger viewer, it should be approximately in the center of the screen | ||
#* Follow instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf]. To tune the beam on tagger dump and perform harp scans beam current should be <10 nA. | #* Follow instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf]. To tune the beam on tagger dump and perform harp scans beam current should be <10 nA. | ||
− | #* Check profile using 2C21 and tagger (2C24) harp scans | + | #* Check profile using 2C21 and tagger (2C24) harp scans and compare the positions and widths with previous scans ([https://logbooks.jlab.org/entry/3696630],[https://logbooks.jlab.org/entry/3696638]) |
#** Positions on both harps should be within 1mm | #** Positions on both harps should be within 1mm | ||
− | #** Width on 2C21 should be <~0. | + | #** Width on 2C21 should be <~0.2+/-0.05 mm |
− | #** Width on tagger harp (2C24) <~0. | + | #** Width on tagger harp (2C24) <~0.5 +/- 0.1mm |
#* Background levels on harp scan are comparable to those of previous scans. | #* Background levels on harp scan are comparable to those of previous scans. | ||
<!--#* Halo counters UPS-L/R and TAG-L/T/T2 should be ~few Hz/nA [https://logbooks.jlab.org/entry/3376736]--> | <!--#* Halo counters UPS-L/R and TAG-L/T/T2 should be ~few Hz/nA [https://logbooks.jlab.org/entry/3376736]--> | ||
Line 207: | Line 207: | ||
#* If HPS chicane must be ON, make sure that chicane GUI says "Chicane Ready" | #* If HPS chicane must be ON, make sure that chicane GUI says "Chicane Ready" | ||
#* Set Hall-B Collimator to 20 mm. | #* Set Hall-B Collimator to 20 mm. | ||
− | #* ''' Check that SVT protection collimator is ON THE BEAM (2.82 mm). If the beam was off for more than | + | #* ''' Check that SVT protection collimator is ON THE BEAM (2.82 mm). If the beam was off for more than 4HPS hours or the configuration has changed, start with 3.94 mm''' |
#* HPS target is '''OUT''' and Hodoscope and ECAL HVs are '''OFF''' | #* HPS target is '''OUT''' and Hodoscope and ECAL HVs are '''OFF''' | ||
− | #* SVT is OUT (position=0.000 mm | + | #* SVT is OUT (position=0.000 mm on the main HPS scaler GUI) and bias HV is off (all red/green indicators RED in SVT bias GUI) |
#* If any uncertainty, page the experts | #* If any uncertainty, page the experts | ||
#* Pay attention into following corrector values: 2C22H, 2C23V, 2H00H, 2H00V, Compare them to ones that are in [https://logbooks.jlab.org/entry/3689166]. Make sure their values don't differ more than 100%. If there is such difference, tell MCC about this. | #* Pay attention into following corrector values: 2C22H, 2C23V, 2H00H, 2H00V, Compare them to ones that are in [https://logbooks.jlab.org/entry/3689166]. Make sure their values don't differ more than 100%. If there is such difference, tell MCC about this. | ||
# ''' Send beam to the Faraday cup ''' | # ''' Send beam to the Faraday cup ''' | ||
− | #* If the beam optics is correct, then you should immediately see the beam spot on the Downstream Viewer and on 2H00 and 2H02 BPMS. | + | #* If the beam optics is correct, then you should immediately see the beam spot on the Downstream Viewer and on the 2H00 and 2H02 BPMS. |
− | #* If you don't see it immediately, and rates on halo counters are more than 100 Khz, then ask MCC, to change to pulsed (tune mode) beam, and ask to | + | #* If you don't see it immediately, and rates on halo counters are more than 100 Khz, then ask MCC, to change to pulsed (tune mode) beam, and ask to restore corrector values. At this point don't accept any CW beam, until beam spot is visible on Downstream Viewer. |
− | #* If MCC operator is not able to tune the beam more than | + | #* If MCC operator is not able to tune the beam more than 15 minutes, then notify RC! |
#* Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. | #* Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. | ||
<b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.</b> | <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.</b> | ||
Line 221: | Line 221: | ||
#* Tune beam profile at HPS using measured widths on 2H01A and 2H02A harps. The required beam profile at 2H02A harp is: X-width <~0.1 mm, Y-width <~ 0.05 mm. Beam profile using 2H01A and 2H02A harps with previous scans ([https://logbooks.jlab.org/entry/3696650],[https://logbooks.jlab.org/entry/3696777]) to compare. | #* Tune beam profile at HPS using measured widths on 2H01A and 2H02A harps. The required beam profile at 2H02A harp is: X-width <~0.1 mm, Y-width <~ 0.05 mm. Beam profile using 2H01A and 2H02A harps with previous scans ([https://logbooks.jlab.org/entry/3696650],[https://logbooks.jlab.org/entry/3696777]) to compare. | ||
#* Check and log the beam spot on chromax viewer | #* Check and log the beam spot on chromax viewer | ||
− | #* The halo counter rates before HPS must be low: | + | #* The halo counter rates before HPS must be very low: |
− | #*# Upstream Left and Right, and the tagger counters few Hz, | + | #*# Upstream Left and Right, and the tagger counters few 10's of Hz, |
#*# Downstream counters should count <Hz/nA | #*# Downstream counters should count <Hz/nA | ||
− | #*# The halo counter rates on HPS, HPS-L/R/T/SC, depends on the collimator and HPS chicane settings, but should not be more than | + | #*# The halo counter rates on HPS, HPS-L/R/T/SC, depends on the collimator and HPS chicane settings, but should not be more than 50 Hz/nA [https://logbooks.jlab.org/entry/3696813] |
#* Positions on BPMs must be close to what they were before [https://logbooks.jlab.org/entry/3696813] | #* Positions on BPMs must be close to what they were before [https://logbooks.jlab.org/entry/3696813] | ||
− | #* When everything is stable, perform SVT wire scan and compare with the nominal [https://logbooks.jlab.org/entry/ | + | #* When everything is stable, perform SVT wire scan and compare with the nominal [https://logbooks.jlab.org/entry/3717335] |
#* Once all the above is achieved, turn ECAL and Hodoscope HV '''ON''' to monitor and log ECal rates | #* Once all the above is achieved, turn ECAL and Hodoscope HV '''ON''' to monitor and log ECal rates | ||
− | #* Insert the | + | #* Insert the 8um W target without turning off the beam. |
# '''Before accepting beam, make sure all the previous conditions are met. Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI.''' | # '''Before accepting beam, make sure all the previous conditions are met. Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI.''' | ||
Revision as of 09:13, 11 August 2019
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERRCOO, ESAD, RSAD Things to read before shift. |
Procedures
|
Manuals |
JLab Logbooks
|
HPS (E12-11-006) 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Raphael Dupre
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
* !! No access to the alcove if the chicane magnet beacon is ON. Chicane magnets must be off if the hall is in Controlled access and access to the alcove is needed or when the hall is in Restricted access. If Chicane magnets are OFF, they can be energized only when the hall is in Power or Beam Permit, [1].
* Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%.
* Please close any GUI that is not being used, e.g. close harp scanner after harp scan is done, close chicane, after chicane is ON, etc
Run Plan August 7-12, 2019
Every Shift:
Every Run:
SVT Bias Currents:Shifters must pay attention to the L0 bias currents. This is on both the SVT motor GUI and the main bias GUI. The bias currents will slowly creep up over the course of a run. When the bias current is between 15-20 uA for either L0 sensor, do the following:
Do not let the bias current exceed 20 uA. It takes about 4-5 hours for the bias currents to creep up to those values. Call SVT expert if unsure. Important Notes:
|
General InstructionsEstablishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |