Difference between revisions of "The HPS Run Wiki"
Line 109: | Line 109: | ||
== Important general instructions == | == Important general instructions == | ||
=== [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry. === | === [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry. === | ||
− | NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. | + | NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. At the end of the shift save BTA to the logbook! |
=== Please close any GUI that is not being used, e.g. close harp scanner after harp scan is done, close chicane, after chicane is ON, etc. === | === Please close any GUI that is not being used, e.g. close harp scanner after harp scan is done, close chicane, after chicane is ON, etc. === | ||
Line 117: | Line 117: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == Run Plan August | + | == Run Plan August 19-20, 2019 == |
* <b>Schedule and plans:</b> | * <b>Schedule and plans:</b> | ||
− | *# Take production data with PROD66 / hps_v10.trg 20um target at 100 nA | + | *# Take production data with PROD66 (PROD67) / hps_v10.trg 20um target at 100 nA |
+ | *# Study new trigger setups to get acceptable LT (>90%) at 120 nA | ||
+ | *# Do beam profile check ones a day, at 3 pm, using 2H02 and SVT wire harps | ||
* <b>Hot items:</b> | * <b>Hot items:</b> | ||
*# Monitor carefully the SVT bias current (see below for details) | *# Monitor carefully the SVT bias current (see below for details) | ||
Line 129: | Line 131: | ||
# Follow run plan as outlined by RC | # Follow run plan as outlined by RC | ||
# '''With any issue contact On-Call Experts or RC''' | # '''With any issue contact On-Call Experts or RC''' | ||
− | # Perform 2H02A harp scan once per | + | # Perform 2H02A harp scan once per day or when beam conditions have changed, based on beam monitors (BPMs, halo rates, beam-viewer). See below for detailed procedure. |
− | # If any concern about beam stability, ask MCC if orbit locks are on (they should be). | + | # If any concern about beam stability, ask MCC if orbit locks are on (they should be ON). |
# Keep shift summary up to date in HBLOG. Record all that happens. | # Keep shift summary up to date in HBLOG. Record all that happens. | ||
− | |||
#* Document any beam condition change and send scaler GUIs to HBLOG | #* Document any beam condition change and send scaler GUIs to HBLOG | ||
− | #* [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. Note: in the "Sift information" tab choose experiment <font color=blue> E12-11-006. </font> | + | #* [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. Note: in the "Sift information" tab choose experiment <font color=blue> E12-11-006. </font>. At the end of the shift send BTA to teh logbook. |
#* Fill and submit the [https://logbooks.jlab.org/checklists/530 shift checklist in the logbook] | #* Fill and submit the [https://logbooks.jlab.org/checklists/530 shift checklist in the logbook] | ||
Line 164: | Line 165: | ||
# Perform the HARP scan, log the results. | # Perform the HARP scan, log the results. | ||
# If the beam looks different, you should call beam-line on-call that will advise on the next steps. | # If the beam looks different, you should call beam-line on-call that will advise on the next steps. | ||
− | # If the beam looks different, perform | + | # If the beam looks different, perform SVT wire scan, the target needs to be retracted as well for this one. |
#* '''IMPORTANT, use the bottom SVT wire scan only.''' Top SVT wire is broken. | #* '''IMPORTANT, use the bottom SVT wire scan only.''' Top SVT wire is broken. | ||
Line 215: | Line 216: | ||
#* Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. | #* Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. | ||
<b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.</b> | <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.</b> | ||
− | #* Ask MCC to establish 30 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration). <b>For orbit lock positions on <font color=red>2H00(X=1.0,Y=1.5) and on 2H02(X=-1. | + | #* Ask MCC to establish 30 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration). <b>For orbit lock positions on <font color=red>2H00(X=1.0,Y=1.5) and on 2H02(X=-1.7,Y=0.3). Use the 2.82 mm SVT collimator. (positions changed 6/25/19 by mg)</font></b>. |
#* Tune beam profile at HPS using measured widths on 2H01A and 2H02A harps. The required beam profile at 2H02A harp is: X-width <~0.1 mm, Y-width <~ 0.05 mm. Beam profile using 2H01A and 2H02A harps with previous scans ([https://logbooks.jlab.org/entry/3696650],[https://logbooks.jlab.org/entry/3696777]) to compare. | #* Tune beam profile at HPS using measured widths on 2H01A and 2H02A harps. The required beam profile at 2H02A harp is: X-width <~0.1 mm, Y-width <~ 0.05 mm. Beam profile using 2H01A and 2H02A harps with previous scans ([https://logbooks.jlab.org/entry/3696650],[https://logbooks.jlab.org/entry/3696777]) to compare. | ||
#* Check and log the beam spot on chromax viewer | #* Check and log the beam spot on chromax viewer |
Revision as of 09:25, 19 August 2019
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERRCOO, ESAD, RSAD Things to read before shift. |
Procedures
|
Manuals |
JLab Logbooks
|
HPS (E12-11-006) 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
Important SAFETY instructions
No access to the alcove if the chicane magnet beacon is ON.
Chicane magnets must be OFF if the hall is in Controlled access and access to the alcove is needed or when the hall is in Restricted access. If Chicane magnets are OFF, they can be energized only when the hall is in Power or Beam Permit, [1].
TURN OFF the chicane magnet if beam is not available due to a thunderstorm. Loss off power would seriously damage detectors.
Important general instructions
Fill out BTA hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry.
NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. At the end of the shift save BTA to the logbook!
Please close any GUI that is not being used, e.g. close harp scanner after harp scan is done, close chicane, after chicane is ON, etc.
Run Plan August 19-20, 2019
Every Shift:
Every Run:
SVT Bias Currents:Shifters must pay attention to the L0 bias currents. This is on both the SVT motor GUI and the main bias GUI. The bias currents will slowly creep up over the course of a run. When the bias current is between 15-20 uA for either L0 sensor, do the following:
Do not let the bias current exceed 20 uA. It takes about 4-5 hours for the bias currents to creep up to those values. Call SVT expert if unsure. Harp Scan Procedure:
Important Notes:
|
General InstructionsEstablishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5244(Shift1), 5245(Shift2) |
Hall-B Counting Room | 5247(Expert), 5502(Target) |
Hall-B Counting Room | 5246(RC1), 5126(RC2) |
Hall-B Gas Shed | 7115 |