Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 126: | Line 126: | ||
# <del>Study DAQ, trigger, and hit rates in the detector vs. 20 um foil position position (move the target up and down by 50 um steps, up to +/-250 um, 5 steps) </del> | # <del>Study DAQ, trigger, and hit rates in the detector vs. 20 um foil position position (move the target up and down by 50 um steps, up to +/-250 um, 5 steps) </del> | ||
# <del>Study DAQ, trigger, and hit rates in the detector vs. beam current for different targets (8 um ad 20 um)</del> | # <del>Study DAQ, trigger, and hit rates in the detector vs. beam current for different targets (8 um ad 20 um)</del> | ||
− | *Take production data with PROD66 (PROD67) / hps_v11_6.trg 8 um target at 300 nA, HPS collimator 2.82 mm. Length of the run will be defined by the SVT bias currents, but no longer than 4 hours. | + | *Take production data with PROD66 (PROD67) / hps_v11_6.trg 8 um target at <del>300</del> 200 nA, HPS collimator 2.82 mm. Length of the run will be defined by the SVT bias currents, but no longer than 4 hours. |
− | *Take production data with PROD66 (PROD67) / hps_v11_6.trg 20um target at 110 nA, HPS collimator 2.82 mm. Length of the run will be defined by the SVT bias currents, but no longer than 4 hours. | + | *<del>Take production data with PROD66 (PROD67) / hps_v11_6.trg 20um target at 110 nA, HPS collimator 2.82 mm. Length of the run will be defined by the SVT bias currents, but no longer than 4 hours. </del> |
<!--# After one produciton run, let SVT expert to do studies at different bias voltages and at low luminosity (50 nA on 8 um target) | <!--# After one produciton run, let SVT expert to do studies at different bias voltages and at low luminosity (50 nA on 8 um target) | ||
# Then continue production data taking | # Then continue production data taking |