Difference between revisions of "The HPS Run Wiki"

From hps run
Jump to navigation Jump to search
Line 126: Line 126:
 
# <del>Study DAQ, trigger, and hit rates in the detector vs. 20 um foil position position (move the target up and down by 50 um steps, up to +/-250 um, 5 steps)  </del>
 
# <del>Study DAQ, trigger, and hit rates in the detector vs. 20 um foil position position (move the target up and down by 50 um steps, up to +/-250 um, 5 steps)  </del>
 
# <del>Study DAQ, trigger, and hit rates in the detector vs. beam current for different targets (8 um ad 20 um)</del>
 
# <del>Study DAQ, trigger, and hit rates in the detector vs. beam current for different targets (8 um ad 20 um)</del>
*Take production data with PROD66 (PROD67) / hps_v11_6.trg 8 um target at 300 nA, HPS collimator 2.82 mm. Length of the run will be defined by the SVT bias currents, but no longer than 4 hours.  
+
*Take production data with PROD66 (PROD67) / hps_v11_6.trg 8 um target at <del>300</del> 200 nA, HPS collimator 2.82 mm. Length of the run will be defined by the SVT bias currents, but no longer than 4 hours.  
*Take production data with PROD66 (PROD67) / hps_v11_6.trg 20um target at 110 nA, HPS collimator 2.82 mm. Length of the run will be defined by the SVT bias currents, but no longer than 4 hours.  
+
*<del>Take production data with PROD66 (PROD67) / hps_v11_6.trg 20um target at 110 nA, HPS collimator 2.82 mm. Length of the run will be defined by the SVT bias currents, but no longer than 4 hours. </del>
 
<!--# After one produciton run, let SVT expert to do studies at different bias voltages and at low luminosity (50 nA on 8 um target)
 
<!--# After one produciton run, let SVT expert to do studies at different bias voltages and at low luminosity (50 nA on 8 um target)
 
# Then continue production data taking
 
# Then continue production data taking

Revision as of 15:13, 27 August 2019


[edit]


Svtpic.png

Ecalpic.png