# Follow run plan as outlined by RC | # Follow run plan as outlined by RC | ||
# Once BPMs are calibrated, ask MCC if orbit locks are on, they should be. | # Once BPMs are calibrated, ask MCC if orbit locks are on, they should be. | ||
− | # Keep shift summary up-to-date in HBLOG | + | # Keep shift summary up-to-date in HBLOG. Record all that happens. |
#* Update the run table on [https://docs.google.com/spreadsheets/d/1l1NurPpsmpgZKgr1qoQpLQBBLz1sszLz4xZF-So4xs8/edit#gid=43855609 Google Docs]. | #* Update the run table on [https://docs.google.com/spreadsheets/d/1l1NurPpsmpgZKgr1qoQpLQBBLz1sszLz4xZF-So4xs8/edit#gid=43855609 Google Docs]. | ||
# Document any beam condition change and send scaler GUIs to HBLOG | # Document any beam condition change and send scaler GUIs to HBLOG | ||
− | # Send "scaler_hps" GUI to logbook at least twice per shift or any time run conditions change | + | # Send "scaler_hps" GUI to logbook at least twice per shift or at any time run conditions change |
− | # Peform 2H02A harp scan | + | # Peform 2H02A harp scan once per shift or when beam conditions have changed, based on beam monitors (BPMs, halo rates, beam-viewer) |
# Fill out shift checklist in the logbook, HBLOG, using template at least ones per shift or when run conditions change | # Fill out shift checklist in the logbook, HBLOG, using template at least ones per shift or when run conditions change | ||
# Continuously check quality of data | # Continuously check quality of data | ||
Line 102: | Line 102: | ||
==<font color=red size=+2>SVT Instructions</font>== | ==<font color=red size=+2>SVT Instructions</font>== | ||
<font color=blue> | <font color=blue> | ||
− | Before sending beam to Faraday cup, verify (and page expert if otherwise): | + | Before sending beam to Faraday cup, verify (and page SVT expert if otherwise): |
* SVT should be open: "Position" at 0.000 mm in scaler GUI | * SVT should be open: "Position" at 0.000 mm in scaler GUI | ||
* SVT HV is off: all red/green indicators RED in SVT bias GUI | * SVT HV is off: all red/green indicators RED in SVT bias GUI |
Revision as of 08:22, 26 March 2015
Important Phone NumbersShift ScheduleShift-Taker's Checklist (old)Hot CheckoutBeam Time Accounting |
Procedures |
Manuals |
JLab Logbooks
|
RC: John Jaros
PDL: Stepan StepanyanEvery Shift:
SVT InstructionsBefore sending beam to Faraday cup, verify (and page SVT expert if otherwise):
The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert.
Acceptable Beam Conditions:Before accepting beam, make sure all the conditions are met - beam profile and halo rates are what you expect (or very close to it). If unsure call to RC, PDL, or beamline expert!
Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI. Every Run:
|
Run Plan:March 26-27, 2015 (day/swing/owl)Yesterday: Things were proceeding well when a power outage hit the whole accelerator complex and counting houses at about 4PM. Time since then has been spent in recovering the machine. HPS shifts have been cancelled, including today's day shift. We'll assess where we are at today's 3 PM meeting, by which time we will have more information from MCC. Program will be re-evaluated at that point. Tentatively: 1) MCC re-tunes upstream beam;(2) When beams are acceptable, MCC restores beams to alcove;(3) When decent beams have been reestablished, calibrate downstream bpms (4) post calibration, require good spot on Chromax, low counts on halo counters, and then set-up chicane. 5) scan target vertically and horizontally, measure halo rates vs target; (5) Take data. Subsystem commissioning studies: more trigger commissioning studies, beam trip studies once orbit locks are on. Close Hall at 4PM, call MCC for sweep, go to controlled and beam permit when MCC is ready MCC works on beam optics and matching, and tunes beam to tagger
Standards are on this page: ACCEPTABLE BEAM CONDITIONS.
Restore Beam to the Hall-B Dump
Energize Chicane
Be very careful when changing magnet currents when beams are on. Must enter new current ACCURATELY. Small steps (few amps) only.
Are we centered? Beamline Expert should enter new target positions if not.
Subsystem Commissioning Studies. Begin Data Taking.
|
|
|
|
|
|
|
|
Webcams:
|
Slow Controls: |
Accelerator:
|
Online & Offline: |