The HPS Run Wiki
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 20152019 HPS production triggers descriptionsHPS Upgrade ERRCOO, ESAD, RSAD Things to read before shift.Remote worker shift - requirements and responsibilitiesHPS 2021 Run discription and beam parameter requirements |
Procedures
|
Manuals |
JLab Logbooks
|
HPS (E12-11-006) 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
Important instructions
* Turn OFF beam before target move!
* No access to the alcove if the chicane magnet beacon is ON.
Chicane magnets must be OFF if the hall is in Controlled access and access to the alcove is needed or when the hall is in Restricted access. If Chicane magnets are OFF, they can be energized only when the hall is in Power or Beam Permit, [1].
* TURN OFF the chicane magnet if beam is not available due to a thunderstorm. Loss off power would seriously damage detectors.
* Fill out BTA hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry.
NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. At the end of the shift save BTA to the logbook!
* Please close any GUI that is not being used, e.g. close harp scanner after harp scan is done, close chicane, after chicane is ON, etc.
* For orbit lock positions on 2H00(X=-0.5,Y=1.5) and on 2H02(X=-1.55,Y=-0.4). Use the 2.82 mm SVT collimator
am profile check once a day, at 9 am, using 2H02 and SVT wire harps
Run Plan August 23 - 30, 2021
Every Shift:
Every Run:
SVT Bias Currents:Shifters must pay attention to the L0 bias currents. This is on both the SVT motor GUI and the main bias GUI. The bias currents will slowly creep up over the course of a run. When the bias current is between 15-20 uA for either L0 sensor, do the following:
Do not let the bias current exceed 20 uA. It takes about 4-5 hours for the bias currents to creep up to those values. Call SVT expert if unsure. Harp Scan Procedure:
Important Notes:
|
General InstructionsEstablishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5244(Shift1), 5245(Shift2) |
Hall-B Counting Room | 5247(Expert), 5502(Target) |
Hall-B Counting Room | 5246(RC1), 5126(RC2) |
Hall-B Gas Shed | 7115 |
Add documentation for remote shifts here!
- Bluejeans for 24-7 communication with counting house: https://bluejeans.com/950041022
- Remote VNC connection: https://logbooks.jlab.org/entry/3880107
- All necessary applications should be avaible from the desktop menu (left/right click on the desktop)
- EPICS GUIs should be accessed ONLY via the desktop menu or by running hps_epics_remote.
- Online Occupancy Monitoring
- ECAL/HODO
- SVT
- Online Full Reconstruction
Shift Worker Backup Table
To add your name, edit this wiki page or send email to Maurik or Nathan.
Worker Shift Backup | |||
---|---|---|---|
Date | Day | Swing | Owl |
Sun, Aug 22 | - | - | - |
Mon, Aug 23 | - | - | - |
Tue, Aug 24 | - | - | - |
Wed, Aug 25 | - | - | - |
Thu, Aug 26 | - | - | - |
Fri, Aug 27 | - | - | - |
Sat, Aug 28 | - | - | - |
Sun, Aug 29 | - | - | - |
Mon, Aug 30 | - | - | - |
Tue, Aug 31 | - | - | - |
Wed, Sep 1 | - | - | - |
Thur, Sep 2 | - | - | - |
Fri, Sep 3 | - | - | - |
Sat, Sep 4 | - | - | - |
Sun, Sep 5 | - | - | - |
Mon, Sep 6 | - | - | - |
Tue, Sep 7 | - | - | - |
Wed, Sep 8 | - | - | - |
Thur, Sep 8 | - | - | - |
Fri, Sep 10 | - | - | - |
Sat, Sep 11 | - | - | - |
Sun, Sep 12 | - | - | - |
Mon, Sep 13 | - | - | - |
Tue, Sep 14 | - | - | - |
Wed, Sep 15 | - | - | - |
Thur, Sep 16 | - | - | - |
Fri, Sep 17 | - | - | - |
Sat, Sep 18 | - | - | - |
Sun, Sep 19 | - | - | - |
Mon, Sep 20 | - | - | - |
Tue, Sep 21 | - | - | - |
Wed, Sep 22 | - | - | - |
Thur, Sep 23 | - | - | - |
Fri, Sep 24 | - | - | - |
Sat, Sep 25 | - | - | - |
Sun, Sep 26 | - | - | - |
Mon, Sep 27 | - | - | - |
Tue, Sep 28 | - | - | - |
Wed, Sep 29 | - | - | - |
Thur, Sep 30 | - | - | - |
Fri, Oct 1 | - | - | - |
Backup shifter contact info | ||
---|---|---|
Name | Cell phone | |
Maurik | holtrop@jlab.org | 1-603-868-8088 |
Nathan | baltzell@jlab.org | - |