Difference between revisions of "The HPS Run Wiki"
(48 intermediate revisions by 3 users not shown) | |||
Line 20: | Line 20: | ||
<!--* [[Media:hps_hallb_checklist.pdf|Hall-B Checklist Preparing for Beam]]--> | <!--* [[Media:hps_hallb_checklist.pdf|Hall-B Checklist Preparing for Beam]]--> | ||
===[[HPS Upgrade ERR]]=== | ===[[HPS Upgrade ERR]]=== | ||
− | ===[https://www.jlab.org/Hall-B/run-web COO, ESAD, RSAD] Things to read before shift. === | + | ===[https://www.jlab.org/Hall-B/run-web COO, ESAD, RSAD] [[Media:HallB_RSAD_new_targets.pdf|Adendum to RSAD]] Things to read before shift. === |
| valign=top | | | valign=top | | ||
Line 95: | Line 95: | ||
</font></center> | </font></center> | ||
− | == RC: | + | == RC: Stepan Stepanyan == |
* (757) 575-7540 | * (757) 575-7540 | ||
* 9 575 7540 from Counting Room | * 9 575 7540 from Counting Room | ||
Line 102: | Line 102: | ||
* 9 876-1789 from Counting Room | * 9 876-1789 from Counting Room | ||
− | === <font color=red> * ! | + | == <font color=red> Important instructions </font> == |
− | === <font color=red> * | + | === <font color=red> * Turn OFF beam before target move!</font> === |
+ | === <font color=red> * No access to the alcove if the chicane magnet beacon is ON.</font> === | ||
+ | Chicane magnets must be OFF if the hall is in Controlled access and access to the alcove is needed or when the hall is in Restricted access. If Chicane magnets are OFF, they can be energized only when the hall is in Power or Beam Permit, [https://wiki.jlab.org/hps-run/images/c/cd/Chicane_controls.pdf]. | ||
+ | === <font color=red> * TURN OFF the chicane magnet if beam is not available due to a thunderstorm. Loss off power would seriously damage detectors.</font> === | ||
− | === | + | === * [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry. === |
+ | NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. At the end of the shift save BTA to the logbook! | ||
+ | === * Please close any GUI that is not being used, e.g. close harp scanner after harp scan is done, close chicane, after chicane is ON, etc. === | ||
+ | |||
+ | === * <b>For orbit lock positions on <font color=red>2H00(X=1.0,Y=1.5) and on 2H02(X=-1.7,Y=0.3). Use the 2.82 mm SVT collimator </font></b> === | ||
{| {{TableStyle1}} | {| {{TableStyle1}} | ||
Line 111: | Line 118: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == Run Plan August | + | == Run Plan August 23-24, 2019 == |
* <b>Schedule and plans:</b> | * <b>Schedule and plans:</b> | ||
− | + | # Establish beam for HPS (see instructions on the right column) | |
− | + | # <b> Take production data with PROD66 (PROD67) / hps_v11_5.trg 20um target at 120 nA, HPS collimator 2.82 mm. Length of the run will be defined by the SVT bias currents, but no longer than 4 hours. | |
− | + | # After one produciton run, let SVT expert to do studies at different bias voltages and at low luminosity (50 nA on 8 um target) | |
− | * | + | # Then continue production data taking |
− | + | <!--# Take random trigger data, 1 run for 300M events: PROD66 (PROD67) / hps_v6_random_30khz.trg 20um target at 120 nA, HPS collimator 2.82 mm | |
− | + | # Take No-target data (~1 hour): PROD66 (PROD67) / hps_v11_5.trg at 120 nA, HPS collimator 2.82 mm --> | |
+ | |||
+ | </b> | ||
+ | |||
+ | <!-- * Beam will be down on Thursday, August 22, ~ 8am for Hall-A wWein angle change: | ||
+ | # At 6:45 am turn off the chicane and call beamline expert to setup for straight track run | ||
+ | # After beam is off, SVT expert will cool down SVT to -20 C and perform a basline run --> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
+ | * Do beam profile check ones a day, at 9 am, using 2H02 and SVT wire harps | ||
==Every Shift:== | ==Every Shift:== | ||
# Follow run plan as outlined by RC | # Follow run plan as outlined by RC | ||
# '''With any issue contact On-Call Experts or RC''' | # '''With any issue contact On-Call Experts or RC''' | ||
− | # | + | # Monitor carefully the SVT bias current (see below for details) |
− | # If any concern about beam stability, ask MCC if orbit locks are on (they should be). | + | # If any concern about beam stability, ask MCC if orbit locks are on (they should be ON). |
# Keep shift summary up to date in HBLOG. Record all that happens. | # Keep shift summary up to date in HBLOG. Record all that happens. | ||
− | |||
#* Document any beam condition change and send scaler GUIs to HBLOG | #* Document any beam condition change and send scaler GUIs to HBLOG | ||
− | #* [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. Note: in the "Sift information" tab choose experiment <font color=blue> E12-11-006. </font> | + | #* [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to automatically fill the left side then make sure numbers are correct. If needed edit the entry. Note: in the "Sift information" tab choose experiment <font color=blue> E12-11-006. </font>. At the end of the shift send BTA to teh logbook. |
#* Fill and submit the [https://logbooks.jlab.org/checklists/530 shift checklist in the logbook] | #* Fill and submit the [https://logbooks.jlab.org/checklists/530 shift checklist in the logbook] | ||
Line 169: | Line 166: | ||
Do not let the bias current exceed 20 uA. It takes about 4-5 hours for the bias currents to creep up to those values. Call SVT expert if unsure. | Do not let the bias current exceed 20 uA. It takes about 4-5 hours for the bias currents to creep up to those values. Call SVT expert if unsure. | ||
+ | |||
+ | == Harp Scan Procedure: == | ||
+ | |||
+ | # During harp scans, SVT must be retracted (motors/SVT Positioners). HVs on SVT, ECal and Hodoscope should be OFF. | ||
+ | # Halo counter FSDs (Downstream, HPS Up and HPS Down) are masked, Beam current 100 nA, Orbit locks running. | ||
+ | # Perform the HARP scan, log the results. | ||
+ | # If the beam looks different, you should call beam-line on-call that will advise on the next steps. | ||
+ | # If the beam looks different, perform SVT wire scan, the target needs to be retracted as well for this one. | ||
+ | #* '''IMPORTANT, use the bottom SVT wire scan only.''' Top SVT wire is broken. | ||
=== Important Notes: === | === Important Notes: === | ||
+ | # When re-establishing beam to Hall B after a >1h long downtime follow "General Guidelines" on the right and the Beamline Procedures and Manual on the shift documentation page. Do not hesitate to call the beamline expert. | ||
# '''Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents.''' | # '''Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents.''' | ||
# ''' For SVT Operations:''' | # ''' For SVT Operations:''' | ||
Line 196: | Line 203: | ||
#* Check the beam position on the tagger viewer, it should be approximately in the center of the screen | #* Check the beam position on the tagger viewer, it should be approximately in the center of the screen | ||
#* Follow instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf]. To tune the beam on tagger dump and perform harp scans beam current should be <10 nA. | #* Follow instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf]. To tune the beam on tagger dump and perform harp scans beam current should be <10 nA. | ||
− | #* Check profile using 2C21 and tagger (2C24) harp scans and compare the positions and widths with previous scans ([https://logbooks.jlab.org/entry/ | + | #* Check profile using 2C21 and tagger (2C24) harp scans and compare the positions and widths with previous scans ([https://logbooks.jlab.org/entry/3720088],[https://logbooks.jlab.org/entry/3720089]) |
#** Positions on both harps should be within 1mm | #** Positions on both harps should be within 1mm | ||
#** Width on 2C21 should be <~0.2+/-0.05 mm | #** Width on 2C21 should be <~0.2+/-0.05 mm | ||
Line 218: | Line 225: | ||
#* Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. | #* Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. | ||
<b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.</b> | <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.</b> | ||
− | #* Ask MCC to establish 30 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration). <b>For orbit lock positions on <font color=red>2H00(X=1.0,Y=1.5) and on 2H02(X=-1. | + | #* Ask MCC to establish 30 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration). <b>For orbit lock positions on <font color=red>2H00(X=1.0,Y=1.5) and on 2H02(X=-1.7,Y=0.3). Use the 2.82 mm SVT collimator. (positions changed 6/25/19 by mg)</font></b>. |
− | #* Tune beam profile at HPS using measured widths on 2H01A and 2H02A harps. The required beam profile at 2H02A harp is: X-width <~0.1 mm, Y-width <~ 0.05 mm. Beam profile using 2H01A and 2H02A harps with previous scans ([https://logbooks.jlab.org/entry/3696650],[https://logbooks.jlab.org/entry/ | + | #* Tune beam profile at HPS using measured widths on 2H01A and 2H02A harps. The required beam profile at 2H02A harp is: X-width <~0.1 mm, Y-width <~ 0.05 mm. Beam profile using 2H01A and 2H02A harps with previous scans ([https://logbooks.jlab.org/entry/3696650],[https://logbooks.jlab.org/entry/3720218]) to compare. |
#* Check and log the beam spot on chromax viewer | #* Check and log the beam spot on chromax viewer | ||
#* The halo counter rates before HPS must be very low: | #* The halo counter rates before HPS must be very low: | ||
Line 226: | Line 233: | ||
#*# The halo counter rates on HPS, HPS-L/R/T/SC, depends on the collimator and HPS chicane settings, but should not be more than 50 Hz/nA [https://logbooks.jlab.org/entry/3696813] | #*# The halo counter rates on HPS, HPS-L/R/T/SC, depends on the collimator and HPS chicane settings, but should not be more than 50 Hz/nA [https://logbooks.jlab.org/entry/3696813] | ||
#* Positions on BPMs must be close to what they were before [https://logbooks.jlab.org/entry/3696813] | #* Positions on BPMs must be close to what they were before [https://logbooks.jlab.org/entry/3696813] | ||
− | #* When everything is stable, perform SVT wire scan and compare with the nominal [https://logbooks.jlab.org/entry/ | + | #* When everything is stable, perform SVT wire scan and compare with the nominal [https://logbooks.jlab.org/entry/3720219] |
#* Once all the above is achieved, turn ECAL and Hodoscope HV '''ON''' to monitor and log ECal rates | #* Once all the above is achieved, turn ECAL and Hodoscope HV '''ON''' to monitor and log ECal rates | ||
− | #* Insert the | + | #* Insert the 20 um W target (turn beam off first). |
# '''Before accepting beam, make sure all the previous conditions are met. Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI.''' | # '''Before accepting beam, make sure all the previous conditions are met. Always read previous log entries, compare settings of BPMs and correctors with previous settings using scaler_hps GUI.''' | ||
Line 311: | Line 318: | ||
| July 24 - August 7 || Maurik Holtrop | | July 24 - August 7 || Maurik Holtrop | ||
|- | |- | ||
− | | August 7 - August | + | | August 7 - August 19 || Raphael Dupre |
|- | |- | ||
− | | August | + | | August 19 - August 21 || Stepan Stepanyan |
|} | |} | ||
Line 511: | Line 518: | ||
| Hall-B Forward Carriage || 5371 | | Hall-B Forward Carriage || 5371 | ||
|- | |- | ||
− | | Hall-B Counting Room || | + | | Hall-B Counting Room || 5244(Shift1), 5245(Shift2) |
+ | |- | ||
+ | | Hall-B Counting Room || 5247(Expert), 5502(Target) | ||
+ | |- | ||
+ | | Hall-B Counting Room || 5246(RC1), 5126(RC2) | ||
|- | |- | ||
|style="border-bottom:3px solid gray;"| Hall-B Gas Shed ||style="border-bottom:3px solid gray;"| 7115 | |style="border-bottom:3px solid gray;"| Hall-B Gas Shed ||style="border-bottom:3px solid gray;"| 7115 |
Revision as of 01:37, 23 August 2019
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERRCOO, ESAD, RSAD Adendum to RSAD Things to read before shift. |
Procedures
|
Manuals |
JLab Logbooks
|
HPS (E12-11-006) 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
Important instructions
* Turn OFF beam before target move!
* No access to the alcove if the chicane magnet beacon is ON.
Chicane magnets must be OFF if the hall is in Controlled access and access to the alcove is needed or when the hall is in Restricted access. If Chicane magnets are OFF, they can be energized only when the hall is in Power or Beam Permit, [1].
* TURN OFF the chicane magnet if beam is not available due to a thunderstorm. Loss off power would seriously damage detectors.
* Fill out BTA hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry.
NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. At the end of the shift save BTA to the logbook!
* Please close any GUI that is not being used, e.g. close harp scanner after harp scan is done, close chicane, after chicane is ON, etc.
* For orbit lock positions on 2H00(X=1.0,Y=1.5) and on 2H02(X=-1.7,Y=0.3). Use the 2.82 mm SVT collimator
Run Plan August 23-24, 2019
Every Shift:
Every Run:
SVT Bias Currents:Shifters must pay attention to the L0 bias currents. This is on both the SVT motor GUI and the main bias GUI. The bias currents will slowly creep up over the course of a run. When the bias current is between 15-20 uA for either L0 sensor, do the following:
Do not let the bias current exceed 20 uA. It takes about 4-5 hours for the bias currents to creep up to those values. Call SVT expert if unsure. Harp Scan Procedure:
Important Notes:
|
General InstructionsEstablishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5244(Shift1), 5245(Shift2) |
Hall-B Counting Room | 5247(Expert), 5502(Target) |
Hall-B Counting Room | 5246(RC1), 5126(RC2) |
Hall-B Gas Shed | 7115 |