Attended: Igor.
- Supplemental materials:
- Final version of KLF_Analysis_ Report (hyperon case) [1]. Tex version is available at overleaf [2].
- Final version of New_Equipment [3].
- Final version of the Raster document [4].
- Final version of the KFM [].
- Final version of the KPT [].
- Final version of the CPS [5].
- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [].
- Cover_Letter draft [].
- KLF_Analysis_ Report (meson case) is coming
- The next meeting is scheduled for June 9th, 7AM [6]