* Supplemental materials:
+
* Supplemental materials for the PAC48 sumission:
  
 
- Final version of KLF_Analysis_ Report (hyperon case) [https://wiki.jlab.org/klproject/images/0/08/KLF_Analysis_Report_%284%29.pdf]. Tex version is available at overleaf [https://www.overleaf.com/project/5e81c348f54cef0001a996f2].  
 
- Final version of KLF_Analysis_ Report (hyperon case) [https://wiki.jlab.org/klproject/images/0/08/KLF_Analysis_Report_%284%29.pdf]. Tex version is available at overleaf [https://www.overleaf.com/project/5e81c348f54cef0001a996f2].  
Line 12: Line 12:
 
- Final version of the KFM [].
 
- Final version of the KFM [].
  
- Final version of the KPT [].
+
- Final version of the KPT [https://wiki.jlab.org/klproject/images/4/4b/IIS20.pdf].
  
 
- Final version of the CPS [https://wiki.jlab.org/klproject/images/5/55/Day20.pdf].
 
- Final version of the CPS [https://wiki.jlab.org/klproject/images/5/55/Day20.pdf].

Revision as of 10:20, 14 May 2020

Attended: Igor.


  • Supplemental materials for the PAC48 sumission:

- Final version of KLF_Analysis_ Report (hyperon case) [1]. Tex version is available at overleaf [2].

- Final version of New_Equipment [3].

- Final version of the Raster document [4].

- Final version of the KFM [].

- Final version of the KPT [5].

- Final version of the CPS [6].

- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [].

- Cover_Letter draft [].

- KLF_Analysis_ Report (meson case) is coming


  • The next meeting is scheduled for June 9th, 7AM [7]