Difference between revisions of "May 26th, 2020"

From kl project
Jump to navigation Jump to search
Line 10: Line 10:
 
- Final version of the Raster document [https://wiki.jlab.org/klproject/images/8/8e/2020-05-07-KLF-Final-Focus.pdf].
 
- Final version of the Raster document [https://wiki.jlab.org/klproject/images/8/8e/2020-05-07-KLF-Final-Focus.pdf].
  
- Final version of the KFM [].
+
- Final version of the KFM [https://wiki.jlab.org/klproject/images/0/0c/FluxMonitor_note_2019_v2.pdf]. It is available on the GlueX DB as GlueX-doc-3603 [https://halldweb.jlab.org/DocDB/0036/003603/003/FluxMonitor_note_v13.pdf].
  
 
- Final version of the KPT [https://wiki.jlab.org/klproject/images/4/4b/IIS20.pdf].
 
- Final version of the KPT [https://wiki.jlab.org/klproject/images/4/4b/IIS20.pdf].

Revision as of 09:30, 14 May 2020

Attended: Igor.


  • Supplemental materials for the PAC48 sumission:

- Final version of KLF_Analysis_ Report (hyperon case) [1]. Tex version is available at overleaf [2].

- Final version of New_Equipment [3].

- Final version of the Raster document [4].

- Final version of the KFM [5]. It is available on the GlueX DB as GlueX-doc-3603 [6].

- Final version of the KPT [7].

- Final version of the CPS [8].

- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [].

- Cover_Letter draft [].

- KLF_Analysis_ Report (meson case) is coming


  • The next meeting is scheduled for June 9th, 7AM [9]