<b>Attended</b>: ''Igor''.
 
<b>Attended</b>: ''Igor''.
 +
  
  
Line 5: Line 6:
  
 
- Final version of KLF_Analysis_ Report (hyperon case) [https://wiki.jlab.org/klproject/images/0/08/KLF_Analysis_Report_%284%29.pdf]. Tex version is available at overleaf [https://www.overleaf.com/project/5e81c348f54cef0001a996f2].  
 
- Final version of KLF_Analysis_ Report (hyperon case) [https://wiki.jlab.org/klproject/images/0/08/KLF_Analysis_Report_%284%29.pdf]. Tex version is available at overleaf [https://www.overleaf.com/project/5e81c348f54cef0001a996f2].  
 +
 +
- KLF_Analysis_ Report (meson case) is coming.
  
 
- Final version of New_Equipment [https://wiki.jlab.org/klproject/images/0/0c/NewEquipment48.pdf].
 
- Final version of New_Equipment [https://wiki.jlab.org/klproject/images/0/0c/NewEquipment48.pdf].
Line 20: Line 23:
 
- Cover_Letter draft [].
 
- Cover_Letter draft [].
  
- KLF_Analysis_ Report (meson case) is coming
 
  
  
 
* The next meeting is scheduled for June 9th, 7AM [https://wiki.jlab.org/klproject/index.php/June_9th,_2020]
 
* The next meeting is scheduled for June 9th, 7AM [https://wiki.jlab.org/klproject/index.php/June_9th,_2020]

Revision as of 09:32, 14 May 2020

Attended: Igor.


  • Supplemental materials for the PAC48 sumission:

- Final version of KLF_Analysis_ Report (hyperon case) [1]. Tex version is available at overleaf [2].

- KLF_Analysis_ Report (meson case) is coming.

- Final version of New_Equipment [3].

- Final version of the Raster document [4].

- Final version of the KFM [5]. It is available on the GlueX DB as GlueX-doc-3603 [6].

- Final version of the KPT [7].

- Final version of the CPS [8].

- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [].

- Cover_Letter draft [].


  • The next meeting is scheduled for June 9th, 7AM [9]