Difference between revisions of "May 26th, 2020"

From kl project
Jump to navigation Jump to search
Line 19: Line 19:
 
- Final version of the CPS [https://wiki.jlab.org/klproject/images/5/55/Day20.pdf].
 
- Final version of the CPS [https://wiki.jlab.org/klproject/images/5/55/Day20.pdf].
  
- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [].
+
- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [https://wiki.jlab.org/klproject/images/c/c8/PAC48_schedule.xlsx].
  
 
- Cover_Letter draft [].
 
- Cover_Letter draft [].

Revision as of 09:34, 14 May 2020

Attended: Igor.


  • Supplemental materials for the PAC48 sumission:

- Final version of KLF_Analysis_ Report (hyperon case) [1]. Tex version is available at overleaf [2].

- KLF_Analysis_ Report (meson case) is coming.

- Final version of New_Equipment [3].

- Final version of the Raster document [4].

- Final version of the KFM [5]. It is available on the GlueX DB as GlueX-doc-3603 [6].

- Final version of the KPT [7].

- Final version of the CPS [8].

- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [9].

- Cover_Letter draft [].


  • The next meeting is scheduled for June 9th, 7AM [10]