Difference between revisions of "May 26th, 2020"

From kl project
Jump to navigation Jump to search
Line 17: Line 17:
 
- Final version of the KFM [https://wiki.jlab.org/klproject/images/0/0c/FluxMonitor_note_2019_v2.pdf]. It is available on the GlueX DB as GlueX-doc-3603 [https://halldweb.jlab.org/DocDB/0036/003603/003/FluxMonitor_note_v13.pdf].
 
- Final version of the KFM [https://wiki.jlab.org/klproject/images/0/0c/FluxMonitor_note_2019_v2.pdf]. It is available on the GlueX DB as GlueX-doc-3603 [https://halldweb.jlab.org/DocDB/0036/003603/003/FluxMonitor_note_v13.pdf].
  
- Final version of the KPT [https://wiki.jlab.org/klproject/images/4/4b/IIS20.pdf].
+
- Final version of the KPT [https://wiki.jlab.org/klproject/images/4/4b/IIS20.pdf]. Tex version is available at overleaf [https://www.overleaf.com/project/5e2f374bb602c30001af9b88].
  
 
- Final version of the CPS [https://wiki.jlab.org/klproject/images/5/55/Day20.pdf].
 
- Final version of the CPS [https://wiki.jlab.org/klproject/images/5/55/Day20.pdf].
Line 28: Line 28:
  
  
* The next meeting is scheduled for June 9th, 7AM [https://wiki.jlab.org/klproject/index.php/June_9th,_2020]
+
* The next meeting is scheduled for June 9th, 7AM [https://wiki.jlab.org/klproject/index.php/June_9th,_2020].

Revision as of 09:56, 14 May 2020

Attended: Igor.


  • There are several people (Moskov, Shankar, Mikhail, Viktor, and Andrey) who are working at overleaf [1] to update our KL proposal.


  • Supplemental materials for the PAC48 sumission:

- Final version of KLF_Analysis_ Report (hyperon case) [2]. Tex version is available at overleaf [3].

- KLF_Analysis_ Report (meson case) is coming.

- Final version of New_Equipment [4].

- Final version of the Raster document [5].

- Final version of the KFM [6]. It is available on the GlueX DB as GlueX-doc-3603 [7].

- Final version of the KPT [8]. Tex version is available at overleaf [9].

- Final version of the CPS [10].

- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [11]. It is available in the KLF proposal on overleaf.

- Cover_Letter draft [12].


  • The next meeting is scheduled for June 9th, 7AM [13].