Difference between revisions of "May 26th, 2020"
Jump to navigation
Jump to search
Line 17: | Line 17: | ||
- Final version of the KFM [https://wiki.jlab.org/klproject/images/0/0c/FluxMonitor_note_2019_v2.pdf]. It is available on the GlueX DB as GlueX-doc-3603 [https://halldweb.jlab.org/DocDB/0036/003603/003/FluxMonitor_note_v13.pdf]. | - Final version of the KFM [https://wiki.jlab.org/klproject/images/0/0c/FluxMonitor_note_2019_v2.pdf]. It is available on the GlueX DB as GlueX-doc-3603 [https://halldweb.jlab.org/DocDB/0036/003603/003/FluxMonitor_note_v13.pdf]. | ||
− | - Final version of the KPT [https://wiki.jlab.org/klproject/images/4/4b/IIS20.pdf]. | + | - Final version of the KPT [https://wiki.jlab.org/klproject/images/4/4b/IIS20.pdf]. Tex version is available at overleaf [https://www.overleaf.com/project/5e2f374bb602c30001af9b88]. |
- Final version of the CPS [https://wiki.jlab.org/klproject/images/5/55/Day20.pdf]. | - Final version of the CPS [https://wiki.jlab.org/klproject/images/5/55/Day20.pdf]. | ||
Line 28: | Line 28: | ||
− | * The next meeting is scheduled for June 9th, 7AM [https://wiki.jlab.org/klproject/index.php/June_9th,_2020] | + | * The next meeting is scheduled for June 9th, 7AM [https://wiki.jlab.org/klproject/index.php/June_9th,_2020]. |
Revision as of 09:56, 14 May 2020
Attended: Igor.
- There are several people (Moskov, Shankar, Mikhail, Viktor, and Andrey) who are working at overleaf [1] to update our KL proposal.
- Supplemental materials for the PAC48 sumission:
- Final version of KLF_Analysis_ Report (hyperon case) [2]. Tex version is available at overleaf [3].
- KLF_Analysis_ Report (meson case) is coming.
- Final version of New_Equipment [4].
- Final version of the Raster document [5].
- Final version of the KFM [6]. It is available on the GlueX DB as GlueX-doc-3603 [7].
- Final version of the KPT [8]. Tex version is available at overleaf [9].
- Final version of the CPS [10].
- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [11]. It is available in the KLF proposal on overleaf.
- Cover_Letter draft [12].
- The next meeting is scheduled for June 9th, 7AM [13].