Difference between revisions of "May 26th, 2020"

From kl project
Jump to navigation Jump to search
Line 7: Line 7:
 
* Supplemental materials for the PAC48 sumission:
 
* Supplemental materials for the PAC48 sumission:
  
- [https://wiki.jlab.org/klproject/images/0/08/KLF_Analysis_Report_%284%29.pdf Final version of KLF_Analysis_ Report (hyperon case)].[https://www.overleaf.com/project/5e81c348f54cef0001a996f2 Tex version is available at overleaf]. There is ref in the proposal.
+
- [https://wiki.jlab.org/klproject/images/0/08/KLF_Analysis_Report_%284%29.pdf Final version of KLF_Analysis_ Report (hyperon case)]. [https://www.overleaf.com/project/5e81c348f54cef0001a996f2 Tex version is available at overleaf]. There is ref in the proposal.
  
 
- KLF_Analysis_ Report (meson case) is coming.
 
- KLF_Analysis_ Report (meson case) is coming.
  
- Final version of New_Equipment [https://wiki.jlab.org/klproject/images/0/0c/NewEquipment48.pdf].   
+
- [https://wiki.jlab.org/klproject/images/0/0c/NewEquipment48.pdf Final version of New_Equipment].   
  
- Final version of the Raster document [https://wiki.jlab.org/klproject/images/8/8e/2020-05-07-KLF-Final-Focus.pdf].  There is ref in the proposal.
+
- [https://wiki.jlab.org/klproject/images/8/8e/2020-05-07-KLF-Final-Focus.pdf Final version of the Raster document].  There is ref in the proposal.
  
- Final version of the KFM [https://wiki.jlab.org/klproject/images/0/0c/FluxMonitor_note_2019_v2.pdf]. It is available on the GlueX DB as GlueX-doc-3603 [https://halldweb.jlab.org/DocDB/0036/003603/003/FluxMonitor_note_v13.pdf]. There is ref in the proposal.
+
- [https://wiki.jlab.org/klproject/images/0/0c/FluxMonitor_note_2019_v2.pdf Final version of the KFM]. [https://halldweb.jlab.org/DocDB/0036/003603/003/FluxMonitor_note_v13.pdf It is available on the GlueX DB as GlueX-doc-3603]. There is ref in the proposal.
  
- Final version of the KPT [https://wiki.jlab.org/klproject/images/4/4b/IIS20.pdf]. Tex version is available at overleaf [https://www.overleaf.com/project/5e2f374bb602c30001af9b88].  There is ref in the proposal.
+
- [https://wiki.jlab.org/klproject/images/4/4b/IIS20.pdf Final version of the KPT]. [https://www.overleaf.com/project/5e2f374bb602c30001af9b88 Tex version is available at overleaf].  There is ref in the proposal.
  
- Final version of the CPS [https://wiki.jlab.org/klproject/images/5/55/Day20.pdf].  There is ref in the proposal.
+
- [https://wiki.jlab.org/klproject/images/5/55/Day20.pdf Final version of the CPS].  There is ref in the proposal.
  
- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [https://wiki.jlab.org/klproject/images/c/c8/PAC48_schedule.xlsx].
+
- [https://wiki.jlab.org/klproject/images/c/c8/PAC48_schedule.xlsx Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline].
 
It is available in the KLF proposal on overleaf.
 
It is available in the KLF proposal on overleaf.
  
- Cover_Letter draft [https://wiki.jlab.org/klproject/images/d/de/Cover48_v1.docx].
+
- [https://wiki.jlab.org/klproject/images/d/de/Cover48_v1.docx Cover_Letter draft].
  
  

Revision as of 18:27, 14 May 2020

Attended: Igor.


  • There are several people (Moskov, Shankar, Mikhail, Viktor, and Andrey) who are working at overleaf [1] to update our KL proposal. It will be good if native speakers find a time to polish our proposal.


  • Supplemental materials for the PAC48 sumission:

- Final version of KLF_Analysis_ Report (hyperon case). Tex version is available at overleaf. There is ref in the proposal.

- KLF_Analysis_ Report (meson case) is coming.

- Final version of New_Equipment.

- Final version of the Raster document. There is ref in the proposal.

- Final version of the KFM. It is available on the GlueX DB as GlueX-doc-3603. There is ref in the proposal.

- Final version of the KPT. Tex version is available at overleaf. There is ref in the proposal.

- Final version of the CPS. There is ref in the proposal.

- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline. It is available in the KLF proposal on overleaf.

- Cover_Letter draft.


  • Our tentative schedule is

- June 22nd is the deadline for the Proposal submission which is Monday.

- June 18th, let us start our submission to have a time to prevent troubles.

- June 4th, let us send a final version of the Proposal to the KLF Collaboration and give folks 10 days for comments (until June 14th). We will have 4 days for the final polishing.

- May 19th is a time for the 3rd KLF Collab (virtual) meeting.


  • The next meeting is scheduled for June 9th, 7AM [2].