Difference between revisions of "August 30th, 2017"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
* Have a "Light Meson Spectroscopy" (tentative title) Workshop at the beginning of 2018. | * Have a "Light Meson Spectroscopy" (tentative title) Workshop at the beginning of 2018. | ||
− | * Using a detail map of Hall D, show CPS and Be-target design and location. It will require new MC for neutron and gamma rad effects. Then Hall D engineers will provide a cost estimation. Bogdan promised to provide a design of CPS in 6 weeks or so. We have to work on the Be-target design. | + | * Using a detail map of Hall D, show CPS and Be-target design and location. It will require new MC for neutron and gamma background (rad) effects. Then Hall D engineers will provide a cost estimation. Bogdan promised to provide a design of CPS in 6 weeks or so. We have to work on the Be-target design. |
* New Start Counter and LH2/LD2 target. We have to set it up in a month or so. | * New Start Counter and LH2/LD2 target. We have to set it up in a month or so. |
Revision as of 09:08, 30 August 2017
Preliminary agenda to discuss a strategy to resubmit our KLF proposal for PAC46 in summer of 2018.
- Focus on two tasks: double strange cascades and kapa-meson.
- Generate quasi-data using a full MC and do the PWA to demonstrate impact of the proposed experiment on the world knowledge. That is the PAC45 suggestion. Mikhail, Nick, Kijun, and Taylor may generate quasi-data and Cesar of JPAC will fit them. We will set it up at the beginning of November.
- New MC for the neutron target... Nick and Mikhail shown that KLn-->K+Sigma- is promising [1]. Using one or two models, Maxim will generate input for Mikhail and Nick. We will set it up on Sept 11th.
- GlueX Collab meeting is scheduled for Oct 12-14 [2]. Let us propose two KLF presentations by Mikhail as "Hyperon Production at KLF and KL Flux Monitoring" and by Marouen as "Meson Spectroscopy with Neutral Kaon Beam".
- Have a "Light Meson Spectroscopy" (tentative title) Workshop at the beginning of 2018.
- Using a detail map of Hall D, show CPS and Be-target design and location. It will require new MC for neutron and gamma background (rad) effects. Then Hall D engineers will provide a cost estimation. Bogdan promised to provide a design of CPS in 6 weeks or so. We have to work on the Be-target design.
- New Start Counter and LH2/LD2 target. We have to set it up in a month or so.