Difference between revisions of "August 11th, 2023"

From kl project
Jump to navigation Jump to search
Line 2: Line 2:
  
 
* On August 7th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_August_7,_2023].
 
* On August 7th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_August_7,_2023].
:* [[media:Report_KLF_ERR_phase_I_v9.pdf | Closeout Report ]]
+
:* [[media:Report_KLF_ERR_phase_I_v9.pdf | Closeout Report ]].
:* CPS model update (''Pavel'')
+
:* [[media:klcps76_07_Aug_2023.pptx | CPS model update]] (''Pavel'').
 +
 
  
  

Revision as of 07:20, 9 August 2023

Attended: Moskov, ... Igor. Eugene is on the vacation.

  • On August 7th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [1].


  • David Hamilton informed us that the Hall C CPS report that we submitted to lab management to get the C1 condition on E12-17-008 lifted.
  • In which case, the conceptual design report for the Hall C CPS is here (this is what we sent to Bob McKeown and was reviewed by Patrizia): [2].
  • The original experimental proposal is here: [3]. We were fully re-approved by PAC51 two weeks ago.


  • Tentive agenda for the KLF Collaboration meeting (September 19th [4]):
  • (10+5') Cynthia Keppel, [Welcome Remarks].
  • (20+10') Doug Higinbotham, [Summary for KLF ERR-I].
  • (15+5') Mikhail Bashkanov, [Excited Omega baryon states at KLF].
  • (15+5') Tim Whitlatch, [K-Long Engineering update].
  • (15+5') Mikhail Bashkanov, [The Flux Monitor - final design].
  • (15+5') Shukui Zhang, [Status of the CEBAF photo-injector drive laser system for KL beam].
  • (15+5') Marco Battaglieri, [Dark matter experiment in Hall D].


  • Discussion of Collaboration structure and participation (all)