Difference between revisions of "August 11th, 2023"
Jump to navigation
Jump to search
Line 6: | Line 6: | ||
:* (20+10') <font color=blue>''Doug Higinbotham''</font>, [Summary for KLF ERR-I]. | :* (20+10') <font color=blue>''Doug Higinbotham''</font>, [Summary for KLF ERR-I]. | ||
:* (15+5') <font color=blue>''Eugene Chudakov''</font>, [Hall D Status Report]. | :* (15+5') <font color=blue>''Eugene Chudakov''</font>, [Hall D Status Report]. | ||
+ | :* (15+5') <font color=blue>''Sean Dobbs''</font>, [Software for KLF]. | ||
:* (15+5') <font color=blue>''Mikhail Bashkanov''</font>, [Excited Omega baryon states at KLF]. | :* (15+5') <font color=blue>''Mikhail Bashkanov''</font>, [Excited Omega baryon states at KLF]. | ||
:* (15+5') <font color=blue>''Marco Battaglieri''</font>, [Dark matter experiment in Hall D]. | :* (15+5') <font color=blue>''Marco Battaglieri''</font>, [Dark matter experiment in Hall D]. |
Revision as of 17:12, 9 August 2023
Attended: Moskov, ... Igor. Eugene is on the vacation.
- Tentive agenda for the KLF Collaboration meeting (September 19th [1]):
- (10+5') Cynthia Keppel, [Welcome Remarks].
- (20+10') Doug Higinbotham, [Summary for KLF ERR-I].
- (15+5') Eugene Chudakov, [Hall D Status Report].
- (15+5') Sean Dobbs, [Software for KLF].
- (15+5') Mikhail Bashkanov, [Excited Omega baryon states at KLF].
- (15+5') Marco Battaglieri, [Dark matter experiment in Hall D].
- (15+5') Tim Whitlatch, [K-Long Engineering update].
- (15+5') Hovanes Egiyan, [Conceptual design of CPS].
- (15+5') Igor Strakovsky, [The Kaon Production target - final design].
- (15+5') Mikhail Bashkanov, [The Flux Monitor - final design].
- (15+5') Shukui Zhang, [Status of the CEBAF photo-injector drive laser system for KL beam].
- Discussion of Collaboration structure and participation (all).
- KLF beam line paper for NIM.
- On August 7th, we had a Hovanes CPS meeting discuss CPS design for Hall D and summary for CPS at ERR-I [2].
- Closeout Report .
- CPS model update (Pavel).
- David Hamilton informed us that the Hall C CPS report that was submitted to lab management to get the C1 condition on E12-17-008 lifted.