− | * | + | * Speakers for the KLF Collaboration meeting (September 19th [https://wiki.jlab.org/klproject/index.php/September_19th,_2023]): |
:* (10+5') <font color=blue>''Cynthia Keppel''</font>, [Welcome Remarks]. | :* (10+5') <font color=blue>''Cynthia Keppel''</font>, [Welcome Remarks]. | ||
:* (20+10') <font color=blue>''Doug Higinbotham''</font>, [Summary for KLF ERR-I]. | :* (20+10') <font color=blue>''Doug Higinbotham''</font>, [Summary for KLF ERR-I]. |
Revision as of 06:45, 11 August 2023
Attended: Moskov, ... Igor. Eugene is on the vacation.
- On August 2nd, we went succesfully through ERR-I [1] and got a commettee blessing to go ahead.
- Speakers for the KLF Collaboration meeting (September 19th [2]):
- (10+5') Cynthia Keppel, [Welcome Remarks].
- (20+10') Doug Higinbotham, [Summary for KLF ERR-I].
- (15+5') Eugene Chudakov, [Hall D Status Report].
- (15+5') Sean Dobbs, [Software for KLF].
- (15+5') Mikhail Bashkanov, [Excited Omega baryon states at KLF].
- (15+5') Marco Battaglieri, [Dark matter experiment in Hall D].
- (15+5') Tim Whitlatch, [K-Long Engineering update].
- (15+5') Hovanes Egiyan, [Conceptual design of CPS].
- (15+5') Igor Strakovsky, [The Kaon Production target - final design].
- (15+5') Mikhail Bashkanov, [The Flux Monitor - final design].
- (15+5') Shukui Zhang, [Status of the CEBAF photo-injector drive laser system for KL beam].
- KLF beam line paper for NIM.
- On August 7th, we had a Hovanes CPS meeting discuss CPS design for Hall D and summary for CPS at ERR-I [3].
- Closeout Report .
- CPS model update (Pavel).
- David Hamilton informed us that the Hall C CPS report that was submitted to lab management to get the C1 condition on E12-17-008 lifted.