Difference between revisions of "KLF Beamline"
Jump to navigation
Jump to search
Line 72: | Line 72: | ||
|- | |- | ||
| Beam pipe diameters || align=center | ??cm || align=left | Needs optimizing | | Beam pipe diameters || align=center | ??cm || align=left | Needs optimizing | ||
+ | |- | ||
+ | | Beam shielding || align=center | ?? || align=left | Needs optimizing | ||
|- | |- | ||
| LH2 target length || align=center | 40cm || align=left | May not be final | | LH2 target length || align=center | 40cm || align=left | May not be final |
Revision as of 10:17, 30 January 2025
Beamline Meetings
Weekly remote Zoom meetings on Thursdays at 9:00am
Meetings in 2025
- KLF beamline meeting - January 30, 2025
- KLF beamline meeting - January 23, 2025
- KLF beamline meeting - January 16, 2025
Meetings in 2024
- KLF beamline meeting - December 19, 2024
- KLF beamline meeting - December 12, 2024
- KLF beamline meeting - December 5, 2024
- KLF beamline meeting - November 21, 2024
- KLF beamline meeting - November 14, 2024
- KLF beamline meeting - November 7, 2024
- KLF beamline meeting - October 31, 2024
- KLF beamline meeting - October 24, 2024
- KLF beamline meeting - October 17, 2024
- KLF beamline meeting - October 10, 2024
- KLF beamline meeting - October 3, 2024
- KLF beamline meeting - September 26, 2024
- KLF beamline meeting - September 19, 2024
- KLF beamline meeting - September 6, 2024
- KLF beamline meeting - August 23, 2024
- KLF beamline meeting - August 9, 2024
- KLF beamline meeting - July 26, 2024
- KLF beamline meeting - July 12, 2024
- KLF beamline meeting - June 28, 2024
- KLF beamline meeting - June 14, 2024
- KLF beamline meeting - May 29, 2024
- KLF beamline meeting - May 1, 2024
- KLF beamline meeting - April 17, 2024
Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1606674688?pwd=b3dnTzJWVEtxZExGRnFoY29PSGkxQT09 Meeting ID: 160 667 4688 Passcode: 709878
Pages for the KLF new beamline components
Drawings
Collimator Cave engineering drawing showing the overview of the beamline and the KPT design
Basic Parameters
Paramater | Value | Comment |
---|---|---|
Radiator thickness | 0.2 X0 | Made of copper |
Be target length | 40cm | |
Be target diameter | 7cm | |
Tungsten plug length | 14cm | |
Tungsten plug width (x&y) | ??cm | |
Beam pipe diameters | ??cm | Needs optimizing |
Beam shielding | ?? | Needs optimizing |
LH2 target length | 40cm | May not be final |
LH2 target diameter | 6cm |
Requirements for KLF electron beam tuning
Beam Paramater | @ CPS radiator | @ KPT entrance |
---|---|---|
Beam current | 50 nA ≤ IB ≤ 5 μA | N/A |
Beam emmitances | εx,y ≤ 20 nm-rad | Ν/Α |
Beam spot size | σx,y = 1.2 mm, (0.8 mm ≤ σx,y ≤ 1.5 mm) | σx,y ≤ 1 cm |
Beam position stability (@ 1 Hz) | σx,y ≤ 0.2 mm | σx,y ≤ 2 mm |
Beam halo (halo-to-peak) | < 10−4 at r ≥ 5σx,y | N/A |
Beam excursion limits in FSD | Δx,y ≥ 1 mm | Δx,y ≥ 1 cm |
Bleedthrough from out-of-time bunches | Specs undefined | N/A |