Difference between revisions of "August 11th, 2023"

From kl project
Jump to navigation Jump to search
 
(17 intermediate revisions by 2 users not shown)
Line 1: Line 1:
<b>Attended</b>: ''Moskov'', ... ''Igor''. ''Eugene'' is on the vacation.
+
<b>Attended</b>: ''Moskov'', ''Jim'', ''Mikhail'', ''Sean'', ''Justin'', ''Hivanes'', and ''Igor''. ''Eugene'' is on the vacation.
  
* On August 7th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_August_7,_2023].
 
:* [[media:Report_KLF_ERR_phase_I_v9.pdf | Closeout Report ]].
 
:* [[media:klcps76_07_Aug_2023.pptx | CPS model update]] (''Pavel'').
 
  
 +
* On August 2nd, we went succesfully through ERR-I [https://wiki.jlab.org/klproject/index.php/KLF_Phase_I_ERR] and got a commettee blessing to go ahead.
  
  
* ''David Hamilton'' informed us that the Hall C CPS report that we submitted to lab management to get the C1 condition on E12-17-008 lifted.
+
* Speakers for the KLF Collaboration meeting (September 19th [https://wiki.jlab.org/klproject/index.php/September_19th,_2023]):
:* In which case, the conceptual design report for the Hall C CPS is here (this is what we sent to ''Bob McKeown'' and was reviewed by ''Patrizia''): [https://wiki.jlab.org/cuawiki/images/4/4f/CPS_document-rev9.pdf].
 
:* The original experimental proposal is here: [https://misportal.jlab.org/pacProposals/proposals/1353/attachments/98388/Proposal.pdf].  We were fully re-approved by PAC51 two weeks ago.
 
 
 
 
 
* Tentive agenda for the KLF Collaboration meeting (September 19th [https://wiki.jlab.org/klproject/index.php/September_19th,_2023]):
 
 
:* (10+5') <font color=blue>''Cynthia Keppel''</font>, [Welcome Remarks].
 
:* (10+5') <font color=blue>''Cynthia Keppel''</font>, [Welcome Remarks].
 
:* (20+10') <font color=blue>''Doug Higinbotham''</font>, [Summary for KLF ERR-I].
 
:* (20+10') <font color=blue>''Doug Higinbotham''</font>, [Summary for KLF ERR-I].
 +
:* (15+5') <font color=blue>''Eugene Chudakov''</font>, [Hall D Status Report].
 
:* (15+5') <font color=blue>''Mikhail Bashkanov''</font>, [Excited Omega baryon states at KLF].
 
:* (15+5') <font color=blue>''Mikhail Bashkanov''</font>, [Excited Omega baryon states at KLF].
 +
:* (15+5') <font color=blue>''Marco Battaglieri''</font>, [Dark matter experiment in Hall D].
 +
:* (15+5') <font color=blue>''Sean Dobbs''</font>, [Software for KLF].
 
:* (15+5') <font color=blue>''Tim Whitlatch''</font>, [K-Long Engineering update].
 
:* (15+5') <font color=blue>''Tim Whitlatch''</font>, [K-Long Engineering update].
:* (15+5') <font color=blue>''Igor Strakovsky''</font>, [The Kaon Production Target - final design].
+
:* (15+5') <font color=blue>''Hovanes Egiyan''</font>, [Conceptual design of CPS].
 +
:* (15+5') <font color=blue>''Igor Strakovsky''</font>, [The Kaon Production target - final design].
 
:* (15+5') <font color=blue>''Mikhail Bashkanov''</font>, [The Flux Monitor - final design].
 
:* (15+5') <font color=blue>''Mikhail Bashkanov''</font>, [The Flux Monitor - final design].
 +
:* (15+5') <font color=blue>''Sunil Pokharel''</font>, [TBD].
 
:* (15+5') <font color=blue>''Shukui Zhang''</font>, [Status of the CEBAF photo-injector drive laser system for KL beam].
 
:* (15+5') <font color=blue>''Shukui Zhang''</font>, [Status of the CEBAF photo-injector drive laser system for KL beam].
:* (15+5') <font color=blue>''Marco Battaglieri''</font>, [Dark matter experiment in Hall D].
+
:* (10+5') <font color=blue>''Edy Nissen''</font>, [Electron Beam Characteristics and Beam Diagnostics].
 +
 
 +
 
 +
* ''Justin'' suggested the discussion of Collaboration structure and participation (all).
  
  
* Discussion of Collaboration structure and participation (all).
 
 
* KLF beam line paper for NIM.
 
* KLF beam line paper for NIM.
 +
 +
 +
* On August 7th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and summary for CPS at ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_August_7,_2023].
 +
:* [[media:Report_KLF_ERR_phase_I_v9.pdf | Closeout Report ]].
 +
:* [[media:klcps76_07_Aug_2023.pptx | CPS model update]] (''Pavel'').
 +
 +
 +
* ''David Hamilton'' informed us that the Hall C CPS report that was submitted to lab management to get the C1 condition on E12-17-008 lifted.
 +
:* In which case, the conceptual design report for the Hall C CPS is here (this is what we sent to ''Bob McKeown'' and was reviewed by ''Patrizia''): [https://wiki.jlab.org/cuawiki/images/4/4f/CPS_document-rev9.pdf].
 +
:* The original experimental proposal is here: [https://misportal.jlab.org/pacProposals/proposals/1353/attachments/98388/Proposal.pdf].  We were fully re-approved by PAC51 two weeks ago.

Latest revision as of 07:49, 12 August 2023

Attended: Moskov, Jim, Mikhail, Sean, Justin, Hivanes, and Igor. Eugene is on the vacation.


  • On August 2nd, we went succesfully through ERR-I [1] and got a commettee blessing to go ahead.


  • Speakers for the KLF Collaboration meeting (September 19th [2]):
  • (10+5') Cynthia Keppel, [Welcome Remarks].
  • (20+10') Doug Higinbotham, [Summary for KLF ERR-I].
  • (15+5') Eugene Chudakov, [Hall D Status Report].
  • (15+5') Mikhail Bashkanov, [Excited Omega baryon states at KLF].
  • (15+5') Marco Battaglieri, [Dark matter experiment in Hall D].
  • (15+5') Sean Dobbs, [Software for KLF].
  • (15+5') Tim Whitlatch, [K-Long Engineering update].
  • (15+5') Hovanes Egiyan, [Conceptual design of CPS].
  • (15+5') Igor Strakovsky, [The Kaon Production target - final design].
  • (15+5') Mikhail Bashkanov, [The Flux Monitor - final design].
  • (15+5') Sunil Pokharel, [TBD].
  • (15+5') Shukui Zhang, [Status of the CEBAF photo-injector drive laser system for KL beam].
  • (10+5') Edy Nissen, [Electron Beam Characteristics and Beam Diagnostics].


  • Justin suggested the discussion of Collaboration structure and participation (all).


  • KLF beam line paper for NIM.


  • On August 7th, we had a Hovanes CPS meeting discuss CPS design for Hall D and summary for CPS at ERR-I [3].


  • David Hamilton informed us that the Hall C CPS report that was submitted to lab management to get the C1 condition on E12-17-008 lifted.
  • In which case, the conceptual design report for the Hall C CPS is here (this is what we sent to Bob McKeown and was reviewed by Patrizia): [4].
  • The original experimental proposal is here: [5]. We were fully re-approved by PAC51 two weeks ago.