Difference between revisions of "August 11th, 2023"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
:* (15+5') <font color=blue>''Mikhail Bashkanov''</font>, [Excited Omega baryon states at KLF]. | :* (15+5') <font color=blue>''Mikhail Bashkanov''</font>, [Excited Omega baryon states at KLF]. | ||
:* (15+5') <font color=blue>''Tim Whitlatch''</font>, [K-Long Engineering update]. | :* (15+5') <font color=blue>''Tim Whitlatch''</font>, [K-Long Engineering update]. | ||
− | :* (15+5') <font color=blue>''Igor Strakovsky''</font>, [The Kaon Production | + | :* (15+5') <font color=blue>''Hovanes Egiyan''</font>, [Conceptual design of CPS]. |
+ | :* (15+5') <font color=blue>''Igor Strakovsky''</font>, [The Kaon Production target - final design]. | ||
:* (15+5') <font color=blue>''Mikhail Bashkanov''</font>, [The Flux Monitor - final design]. | :* (15+5') <font color=blue>''Mikhail Bashkanov''</font>, [The Flux Monitor - final design]. | ||
:* (15+5') <font color=blue>''Shukui Zhang''</font>, [Status of the CEBAF photo-injector drive laser system for KL beam]. | :* (15+5') <font color=blue>''Shukui Zhang''</font>, [Status of the CEBAF photo-injector drive laser system for KL beam]. |
Revision as of 14:46, 9 August 2023
Attended: Moskov, ... Igor. Eugene is on the vacation.
- Tentive agenda for the KLF Collaboration meeting (September 19th [1]):
- (10+5') Cynthia Keppel, [Welcome Remarks].
- (20+10') Doug Higinbotham, [Summary for KLF ERR-I].
- (15+5') Eugene Chudakov, [Hall D Status Report].
- (15+5') Mikhail Bashkanov, [Excited Omega baryon states at KLF].
- (15+5') Tim Whitlatch, [K-Long Engineering update].
- (15+5') Hovanes Egiyan, [Conceptual design of CPS].
- (15+5') Igor Strakovsky, [The Kaon Production target - final design].
- (15+5') Mikhail Bashkanov, [The Flux Monitor - final design].
- (15+5') Shukui Zhang, [Status of the CEBAF photo-injector drive laser system for KL beam].
- (15+5') Marco Battaglieri, [Dark matter experiment in Hall D].
- Discussion of Collaboration structure and participation (all).
- KLF beam line paper for NIM.
- On August 7th, we had a Hovanes CPS meeting discuss CPS design for Hall D and summary for CPS at ERR-I [2].
- Closeout Report .
- CPS model update (Pavel).
- David Hamilton informed us that the Hall C CPS report that was submitted to lab management to get the C1 condition on E12-17-008 lifted.