Difference between revisions of "May 26th, 2020"

From kl project
Jump to navigation Jump to search
Line 12: Line 12:
 
- [https://wiki.jlab.org/klproject/images/0/08/KLF_Analysis_Report_%284%29.pdf Final version of KLF_Analysis_ Report (hyperon case)]. [https://www.overleaf.com/project/5e81c348f54cef0001a996f2 Tex version is available at overleaf]. There is ref in the proposal.
 
- [https://wiki.jlab.org/klproject/images/0/08/KLF_Analysis_Report_%284%29.pdf Final version of KLF_Analysis_ Report (hyperon case)]. [https://www.overleaf.com/project/5e81c348f54cef0001a996f2 Tex version is available at overleaf]. There is ref in the proposal.
  
- KLF_Analysis_ Report (meson case) is coming.
+
- KLF_Analysis_ Report (meson case) is coming soon.
  
 
- [https://wiki.jlab.org/klproject/images/0/0c/NewEquipment48.pdf Final version of New_Equipment].   
 
- [https://wiki.jlab.org/klproject/images/0/0c/NewEquipment48.pdf Final version of New_Equipment].   

Revision as of 20:34, 24 May 2020

Attended: Igor.


  • There are several people (Moskov, Shankar, Mikhail) who are working at overleaf [1] to update our KL proposal. Sean is polishing our English, thanks a lot, Sean.


  • PAC48 documents [2]


  • Supplemental materials for the PAC48 sumission:

- Final version of KLF_Analysis_ Report (hyperon case). Tex version is available at overleaf. There is ref in the proposal.

- KLF_Analysis_ Report (meson case) is coming soon.

- Final version of New_Equipment.

- Final version of the Raster document. There is ref in the proposal.

- Final version of the KFM. It is available on the GlueX DB as GlueX-doc-3603. There is ref in the proposal.

- Final version of the KPT. Tex version is available at overleaf. There is ref in the proposal.

- Final version of the CPS. There is ref in the proposal.

- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline. It is available in the KLF proposal on overleaf.

- Cover_Letter draft, v2.


  • Our tentative schedule is

- June 23rd: Spokesperson meeting [3].

- June 22nd: Deadline for the Proposal submission which is Monday.

- June 18th: Submission time for the Proposal.

- June 14th: Deadline for the KLF Collaboration review of the proposal.

- June 9th: Spokesperson meeting [4].

- June 4th: Final version of the Proposal and supplemental files will go to the KLF Collaboration review.

- May 26th: Spokesperson meeting [5].

- May 19th: 3rd KLF Collaboration (virtual) meeting [6]. 58 people signed [7] and 38 of them attended.