Difference between revisions of "September 20th, 2022"

From kl project
Jump to navigation Jump to search
Line 1: Line 1:
 
<b>Attended</b>: ..., and ''Igor''.
 
<b>Attended</b>: ..., and ''Igor''.
  
* On September 12th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_September_12,_2022]. [[media:CPS_temp_calcs_09_12_22.pdf | Temperature map calculations]] (''Tim'')  
+
* On September 12th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_September_12,_2022]. [[media:CPS_temp_calcs_09_12_22.pdf | Temperature map calculations]] (''Tim''). [[media:CSP_update_09_12_22.pdf | Updates on the conceptual design]] (''Vitaly'').
Temperature map calculations (''Tim'')[https://wiki.jlab.org/klproject/images/2/20/CPS_steady_state_thermal_v8.pdf]. Updates on the conceptual design (''Vitaly'') [https://wiki.jlab.org/klproject/images/1/1e/CSP_update_09_12_22.pdf].
 
  
 
* On September 19th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_September_19,_2022].
 
* On September 19th, we had a ''Hovanes'' CPS meeting for a development of the conseptual design of the Tiger hall with CPS [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_September_19,_2022].

Revision as of 16:13, 12 September 2022

Attended: ..., and Igor.

  • On September 19th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [2].


  • Thursday, November 3rd, we will have the 6th KLF Collaboration meeting. The tentative agenda is in [3].