Difference between revisions of "December 6th, 2022"

From kl project
Jump to navigation Jump to search
Line 24: Line 24:
 
:* Temperature calculations (''Tim'')
 
:* Temperature calculations (''Tim'')
 
:* Updates on ''Vitaly's'' model
 
:* Updates on ''Vitaly's'' model
:* [[media:pavel_updates_12_12_20022.pptx | Updates on ''Pavel's'' model]]  
+
:* [[media:pavel_updates_12_12_20022.pdf | Updates on ''Pavel's'' model]]  
 
::* [https://userweb.jlab.org/~pavel/projects/KLCPS/klcps54/ Extra material]
 
::* [https://userweb.jlab.org/~pavel/projects/KLCPS/klcps54/ Extra material]

Revision as of 20:23, 12 December 2022

Attended: Moskov, Sean, Mikhail, Justin, Eugene, Hovanes, and Igor.

  • On November 28th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tagger vault with CPS [1].
  • On December 2nd, Tanja Horn had a CPS meeting (main focus is CPS for Hall C, incuding stress/thermal calculations) [2].
  • On December 5th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tagger vault with CPS [3].
  • On December 8th, we had a Hovanes KPT meeting for to prepare for ERR [4].
  • On December 12th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tagger vault with CPS [5].