* ''David Hamilton'' informed us that the Hall C CPS report that we submitted to lab management to get the C1 condition on E12-17-008 lifted.  
+
* ''David Hamilton'' informed us that the Hall C CPS report that was submitted to lab management to get the C1 condition on E12-17-008 lifted.  
 
:* In which case, the conceptual design report for the Hall C CPS is here (this is what we sent to ''Bob McKeown'' and was reviewed by ''Patrizia''): [https://wiki.jlab.org/cuawiki/images/4/4f/CPS_document-rev9.pdf].
 
:* In which case, the conceptual design report for the Hall C CPS is here (this is what we sent to ''Bob McKeown'' and was reviewed by ''Patrizia''): [https://wiki.jlab.org/cuawiki/images/4/4f/CPS_document-rev9.pdf].
 
:* The original experimental proposal is here: [https://misportal.jlab.org/pacProposals/proposals/1353/attachments/98388/Proposal.pdf].  We were fully re-approved by PAC51 two weeks ago.
 
:* The original experimental proposal is here: [https://misportal.jlab.org/pacProposals/proposals/1353/attachments/98388/Proposal.pdf].  We were fully re-approved by PAC51 two weeks ago.

Revision as of 09:25, 9 August 2023

Attended: Moskov, ... Igor. Eugene is on the vacation.


  • Tentive agenda for the KLF Collaboration meeting (September 19th [1]):
  • (10+5') Cynthia Keppel, [Welcome Remarks].
  • (20+10') Doug Higinbotham, [Summary for KLF ERR-I].
  • (15+5') Mikhail Bashkanov, [Excited Omega baryon states at KLF].
  • (15+5') Tim Whitlatch, [K-Long Engineering update].
  • (15+5') Igor Strakovsky, [The Kaon Production Target - final design].
  • (15+5') Mikhail Bashkanov, [The Flux Monitor - final design].
  • (15+5') Shukui Zhang, [Status of the CEBAF photo-injector drive laser system for KL beam].
  • (15+5') Marco Battaglieri, [Dark matter experiment in Hall D].


  • Discussion of Collaboration structure and participation (all).
  • KLF beam line paper for NIM.


  • On August 7th, we had a Hovanes CPS meeting discuss CPS design for Hall D and to prepare for ERR-I [2].


  • David Hamilton informed us that the Hall C CPS report that was submitted to lab management to get the C1 condition on E12-17-008 lifted.
  • In which case, the conceptual design report for the Hall C CPS is here (this is what we sent to Bob McKeown and was reviewed by Patrizia): [3].
  • The original experimental proposal is here: [4]. We were fully re-approved by PAC51 two weeks ago.