Difference between revisions of "August 11th, 2023"
Jump to navigation
Jump to search
Line 17: | Line 17: | ||
− | * On August 7th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and | + | * On August 7th, we had a ''Hovanes'' CPS meeting discuss CPS design for Hall D and summary for CPS at ERR-I [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_August_7,_2023]. |
:* [[media:Report_KLF_ERR_phase_I_v9.pdf | Closeout Report ]]. | :* [[media:Report_KLF_ERR_phase_I_v9.pdf | Closeout Report ]]. | ||
:* [[media:klcps76_07_Aug_2023.pptx | CPS model update]] (''Pavel''). | :* [[media:klcps76_07_Aug_2023.pptx | CPS model update]] (''Pavel''). |
Revision as of 09:27, 9 August 2023
Attended: Moskov, ... Igor. Eugene is on the vacation.
- Tentive agenda for the KLF Collaboration meeting (September 19th [1]):
- (10+5') Cynthia Keppel, [Welcome Remarks].
- (20+10') Doug Higinbotham, [Summary for KLF ERR-I].
- (15+5') Mikhail Bashkanov, [Excited Omega baryon states at KLF].
- (15+5') Tim Whitlatch, [K-Long Engineering update].
- (15+5') Igor Strakovsky, [The Kaon Production Target - final design].
- (15+5') Mikhail Bashkanov, [The Flux Monitor - final design].
- (15+5') Shukui Zhang, [Status of the CEBAF photo-injector drive laser system for KL beam].
- (15+5') Marco Battaglieri, [Dark matter experiment in Hall D].
- Discussion of Collaboration structure and participation (all).
- KLF beam line paper for NIM.
- On August 7th, we had a Hovanes CPS meeting discuss CPS design for Hall D and summary for CPS at ERR-I [2].
- Closeout Report .
- CPS model update (Pavel).
- David Hamilton informed us that the Hall C CPS report that was submitted to lab management to get the C1 condition on E12-17-008 lifted.