May 26th, 2020

From kl project
Revision as of 10:39, 14 May 2020 by Igor (talk | contribs)
Jump to navigation Jump to search

Attended: Igor.


  • Supplemental materials for the PAC48 sumission:

- Final version of KLF_Analysis_ Report (hyperon case) [1]. Tex version is available at overleaf [2].

- KLF_Analysis_ Report (meson case) is coming.

- Final version of New_Equipment [3].

- Final version of the Raster document [4].

- Final version of the KFM [5]. It is available on the GlueX DB as GlueX-doc-3603 [6].

- Final version of the KPT [7].

- Final version of the CPS [8].

- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [9]. It is available in the KLF proposal on overleaf.

- Cover_Letter draft [10].


  • The next meeting is scheduled for June 9th, 7AM [11]