May 26th, 2020

From kl project
Revision as of 10:44, 14 May 2020 by Igor (talk | contribs)
Jump to navigation Jump to search

Attended: Igor.


  • There are several people (Moskov, Shankar, Mikhail, Viktor, and Andrey) who are working at overleaf [1] to update our KL proposal.


  • Supplemental materials for the PAC48 sumission:

- Final version of KLF_Analysis_ Report (hyperon case) [2]. Tex version is available at overleaf [3].

- KLF_Analysis_ Report (meson case) is coming.

- Final version of New_Equipment [4].

- Final version of the Raster document [5].

- Final version of the KFM [6]. It is available on the GlueX DB as GlueX-doc-3603 [7].

- Final version of the KPT [8].

- Final version of the CPS [9].

- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [10]. It is available in the KLF proposal on overleaf.

- Cover_Letter draft [11].


  • The next meeting is scheduled for June 9th, 7AM [12]