May 26th, 2020

From kl project
Revision as of 18:21, 14 May 2020 by Igor (talk | contribs)
Jump to navigation Jump to search

Attended: Igor.


  • There are several people (Moskov, Shankar, Mikhail, Viktor, and Andrey) who are working at overleaf [1] to update our KL proposal. It will be good if native speakers find a time to polish our proposal.


  • Supplemental materials for the PAC48 sumission:

- Final version of KLF_Analysis_ Report (hyperon case). Tex version is available at overleaf [2]. There is ref in the proposal.

- KLF_Analysis_ Report (meson case) is coming.

- Final version of New_Equipment [3].

- Final version of the Raster document [4]. There is ref in the proposal.

- Final version of the KFM [5]. It is available on the GlueX DB as GlueX-doc-3603 [6]. There is ref in the proposal.

- Final version of the KPT [7]. Tex version is available at overleaf [8]. There is ref in the proposal.

- Final version of the CPS [9]. There is ref in the proposal.

- Final version of the timeline for the different stages of the design, construction, and installation of the KL beamline [10]. It is available in the KLF proposal on overleaf.

- Cover_Letter draft [11].


  • Our tentative schedule is

- June 22nd is the deadline for the Proposal submission which is Monday.

- June 18th, let us start our submission to have a time to prevent troubles.

- June 4th, let us send a final version of the Proposal to the KLF Collaboration and give folks 10 days for comments (until June 14th). We will have 4 days for the final polishing.

- May 19th is a time for the 3rd KLF Collab (virtual) meeting.


  • The next meeting is scheduled for June 9th, 7AM [12].