September 20th, 2022

From kl project
Revision as of 15:12, 12 September 2022 by Igor (talk | contribs)
Jump to navigation Jump to search

Attended: ..., and Igor.

Temperature map calculations (Tim)[2]. Updates on the conceptual design (Vitaly) [3].

  • On September 19th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tiger hall with CPS [4].


  • Thursday, November 3rd, we will have the 6th KLF Collaboration meeting. The tentative agenda is in [5].