January 10th, 2023

From kl project
Revision as of 14:30, 6 January 2023 by Igor (talk | contribs) (Created page with "<b>Attended</b>: ... and ''Igor''. * On December 8th, we had a ''Hovanes'' KPT meeting for to prepare for ERR [https://wiki.jlab.org/klproject/index.php/CPS_meeting_-_Decembe...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Attended: ... and Igor.

  • On December 8th, we had a Hovanes KPT meeting for to prepare for ERR [1].
  • On December 12th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tagger vault with CPS [2].
  • On January 9th, we had a Hovanes CPS meeting for a development of the conseptual design of the Tagger vault with CPS [3].
  • Temperature calculations (Tim)
  • Updates on Vitaly's model
  • Updates on Pavel's model
  • On January 27th, Tanja Horn had a CPS meeting (main focus is CPS for Hall C, incuding stress/thermal calculations) [4].