KLF beamline meeting - August 9, 2024

From kl project
Jump to navigation Jump to search

Agenda

  • Announcements
  • KFM update (Mikhail)
  • Beam for detector calibrations (Sean, Mikhail, Igal)
  • Updates on CPS simulations (Pavel)
  • CPS, KPT, and cryo-target design progress (Tim)
  • Bleedthrough specifications?
    Updates on CPS simulations (Vitaly Baturin)


  • Any other business


Minutes

Present: Pavel, Igor, Hovanes, Josh, Eugene, Edy, Beni, Marshall, Vitaly, Sean, Moskov, Richard, Ryan, Sean, Tim


  • Mikhail was traveling and was not present at the meeting, but he sent Hovanes a message with a very brief status update. Al detectors that KFM needs are uninstalled and prepared for packing (tracker is packed). The moving company wants to pack everything by their own crew to be sure that all pieces are safe. Nothing is shipped yet, since the paperwork is not complete.