18842 - Modify LERF LCLS-II Interlock Controls

18823 - LERF Gun HV checkout with activated photocathode

18804 - LERF LLRF Firm/Software Update 2

18803 - LERF LCLS-II Heater Protection Update

18783 - LERF LLRF Firm/Software Update

18770 - 30K Temp bump of LCLS-II CM in LERF Vault

18613 - LCLSII Transporting and Mat'l Handling

18537 - Move LCLS-ll cryomodule to position two

18346 - Air Lines LCLSII CG to Cryo Valves

18335 - Install Bellows Support Rail

18237 - LERF Single SSA Tests

18069 - Move LCLSII Cryo Module from Test Lab to LERF Vault

18177 - Cable Pull LCLS2

18007 - LCLSII SSA/HPA raised Floor

17923 - Installation of RF waveguide for two LCLS II Modules

17884 - LERF Waveguide Anchor Point Layout

17882 - Shut Down of Panel E-1000 in LERF

17881 - Alignment of FL02 LERF Cryomodule

17841 - LCLSII SSA Delivery & Setting Material Handling Support

17834 - Install LCLSII CM End Can

17831 - Install Wave Guide Supports and U-Tube Lifting Plates for LCLSII

17825 - Raise 2 Klystron Racks 2" & Install Al. Box Tube Spacers

17743 - ^LERF cryomodule shuffle

17689 - Prep FEL Girders 8F02, 8F03 and UV Happek for Removal From Beamline

17688 - Shut Down of Panel E1000 in LERF Gallery

17642 - Lerf beamline girder disconnects @ 1F02, 1F03 and 1F04

17628 - FL03 & 4 removal of HPA low level and CPS control power

17579 - Re-Assemble LERF GW Dipoles

17577 - Disconnect and Remove All Utilities From Dark Light Power Supply

17575 - Remove LERF Vault Truck Ramp Gate

17574 - Remove Dark Light Solenoid Power Lead & Cable Tray

17573 - Rework Power in LERF for New LCLS2 Project

17539 - Remove waterflow equipment from the Darklight power supply/system (LERF)

17537 - LERF Truck Ramp Shielding Block Removal

17535 - LERF UV Collimator and VUV Turning Can Removal

17533 - LERF/PSS IFIX Communication Investigation (System B)

17532 - LERF BLM Removal for Cryomodule and LCLS-II Support

17529 - Vent-up & remove beam line LERF 4F region

17528 - LERF ODH System Certification

17527 - Disconnect LERF Trim Magnets For Cryomodule Removal

17518 - Disconnect LERF bpms for Cryomodule removal

17517 - LERF WaveGuide Removal

17516 - LERF CM1F03 & 04 Removal

17514 - Secure Vacuum Cables for removal of 1F02 / 1F03 Cryomodules

17513 - LERF ODH ANNUAL CHANGE OUT 2017

17440 - Maintenance of LERF PSS Run/safe Boxes

17416 - Verify LERF Klystrons are suitable for use in 1L13 for new C50

17320 - LERF Module Drive high determination

17177 - Q0 Improvement of cryomodule by In-situ Demagnetization