From: "Edward Daly" <edaly@jlab.org> To: "Kelly Dixon" <kdixon@jlab.org> Cc: "James Henry" <jhenry@jlab.org>, "Nusair Hasan" <hasan@jlab.org>, "Christopher Perry" <cperry@jlab.org> Sent: Wednesday, November 29, 2017 3:02:08 PM Subject: Re: LCLS2 CM Cryo Connections at LERF

Dear Kelly,

Thanks. I'll set up a meeting for next week so we can discuss some of these items. It's probably more effective that email.

Cheers,

Ed


Original Message -----

From: "Kelly Dixon" <kdixon@jlab.org> To: "Edward Daly" <edaly@jlab.org> Cc: "James Henry" <jhenry@jlab.org>, "Nusair Hasan" <hasan@jlab.org>, "Christopher Perry" <cperry@jlab.org> Sent: Wednesday, November 29, 2017 2:46:26 PM Subject: Fwd: LCLS2 CM Cryo Connections at LERF

Hi Ed,

Operational comments from Nusair and Chris.

Kelly


Forwarded Message -----

From: "Nusair Hasan" <hasan@jlab.org> To: "Kelly Dixon" <kdixon@jlab.org> Cc: "Christopher Perry" <cperry@jlab.org> Sent: Wednesday, November 29, 2017 2:35:51 PM Subject: RE: LCLS2 CM Cryo Connections at LERF

Hi Kelly:

Chris and I discussed about this briefly and had the following questions/comments -

1. Is it possible to obtain marked-up P&Is for each of the modes of operation (cool-down, RF testing, Qo measurement, warm-up) showing which paths will be utilized?

2. Are we expected to transition to 4K for each cryo-module cool-down (or warm-up)? In that case, what is the expected time between cryo-module switch?

3. What is the Cryo-module fast cool-down path? Will it be done when the Linac is at 2K?

4. We will need additional cryo-modules in LERF to keep the STL/RTL flow thermally stable during the testing.

5. Unlike the JLab cryo-modules, there is no phase separator and seems like the JT is a top fill valve. This might generate thermal instability in the RTL (and cold compressor suction) during transients.

6. Considering point 5, it will probably be better if Cryo has access/control of the JT valve during 'normal' operations (similar to the cryo-modules in the Linac where, SRF controls the JT during cool-down and Qo measurements and Cryo has the control during stable 2K operations).

7. I would recommend adding a manual valve (able to handle sub-atm. pressure) downstream of CEVCMXX_CD (primary return to CD header) and have it isolate the CD line once returns are switched to PR header.

Thanks, Nusair



Original Message-----

From: Kelly Dixon [1] Sent: Tuesday, November 28, 2017 8:48 AM To: Nusair Hasan <hasan@jlab.org> Subject: Fwd: LCLS2 CM Cryo Connections at LERF

Please look at the P&I and give me your thoughts. --Kelly


Forwarded Message -----

From: "Jim Henry" <jhenry@jlab.org> To: "Kelly Dixon" <kdixon@jlab.org> Cc: "Edward Daly" <edaly@jlab.org> Sent: Monday, November 27, 2017 4:31:49 PM Subject: Re: LCLS2 CM Cryo Connections at LERF

Kelly,

Attached is the latest working copy of our P&ID for testing of the LCLS-II Cryomodules in the LERF, and a link to a .jt file for the geometry.

Your review and comments will be greatly appreciated.

Jim H

M:\srfdpt\Henry-2010\LCLS2\LERF\CAD\JT FILE 27NOV17 LCLS-II_TESTING_IN_LERF_27NOV17.jt


Original Message -----

From: "Edward Daly" <edaly@jlab.org> To: "Kelly Dixon" <kdixon@jlab.org> Cc: "James Henry" <jhenry@jlab.org> Sent: Wednesday, November 22, 2017 9:58:14 AM Subject: Re: LCLS2 CM Cryo Connections at LERF

Hi Kelly,

When Jim returns next week, we will provide the latest images from models as well as the P&ID. All designs are in a preliminary state at this time.

Happy Thanksgiving!

-Ed


Original Message -----

From: "Kelly Dixon" <kdixon@jlab.org> To: "Edward Daly" <edaly@jlab.org> Cc: "James Henry" <jhenry@jlab.org> Sent: Wednesday, November 22, 2017 9:06:40 AM Subject: LCLS2 CM Cryo Connections at LERF

Hi Ed,

Hope that you have some nice plans for the holiday.

Will asked that you send me the design details so that I can review this.

-- Kelly Dixon Cryogenics Dept, Jefferson Lab 757-269-6285 757-269-7352(fax)