#17642 - Lerf beamline girder disconnects @ 1F02, 1F03 and 1F04
+
18842 - Modify LERF LCLS-II Interlock Controls
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18842]
 +
 
 +
18823 - LERF Gun HV checkout with activated photocathode
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18823]
 +
 
 +
18804 - LERF LLRF Firm/Software Update 2
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18804]
 +
 
 +
18803 - LERF LCLS-II Heater Protection Update
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18803]
 +
 
 +
18783 - LERF LLRF Firm/Software Update
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18783]
 +
 
 +
18770 - 30K Temp bump of LCLS-II CM in LERF Vault
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18770]
 +
 
 +
18613 - LCLSII Transporting and Mat'l Handling
 +
*[http://opsweb.acc.jlab.org/CSUEApps/atlis/task/18613]
 +
 
 +
18537 - Move LCLS-ll cryomodule to position two
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18537]
 +
 
 +
18346 - Air Lines LCLSII CG to Cryo Valves
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18346]
 +
 
 +
18335 - Install Bellows Support Rail
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18335]
 +
 
 +
18237 - LERF Single SSA Tests
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18237]
 +
 
 +
18069 - Move LCLSII Cryo Module from Test Lab to LERF Vault
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18069]
 +
 
 +
18177 - Cable Pull LCLS2
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18177]
 +
 
 +
18007 - LCLSII SSA/HPA raised Floor
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/18007]
 +
 
 +
17923 - Installation of RF waveguide for two LCLS II Modules
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17923]
 +
 
 +
17884 - LERF Waveguide Anchor Point Layout
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17884]
 +
 
 +
17882 - Shut Down of Panel E-1000 in LERF
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17882]
 +
 
 +
17881 - Alignment of FL02 LERF Cryomodule
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17881]
 +
 
 +
17841 - LCLSII SSA Delivery & Setting Material Handling Support
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17841]
 +
 
 +
17834 - Install LCLSII CM End Can
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17834]
 +
 
 +
17831 - Install Wave Guide Supports and U-Tube Lifting Plates for LCLSII
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17831]
 +
 
 +
17825 - Raise 2 Klystron Racks 2" & Install Al. Box Tube Spacers
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17825]
 +
 
 +
17743 - ^LERF cryomodule shuffle
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=17743]
 +
 
 +
17689 - Prep FEL Girders 8F02, 8F03 and UV Happek for Removal From Beamline
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17689]
 +
 
 +
17688 - Shut Down of Panel E1000 in LERF Gallery
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17688]
 +
 
 +
17642 - Lerf beamline girder disconnects @ 1F02, 1F03 and 1F04
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17642]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17642]
  
#17628 - FL03 & 4 removal of HPA low level and CPS control power
+
17628 - FL03 & 4 removal of HPA low level and CPS control power
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17628]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17628]
  
#17579 - Re-Assemble LERF GW Dipoles
+
17579 - Re-Assemble LERF GW Dipoles
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17579]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17579]
  
#17577 - Disconnect and Remove All Utilities From Dark Light Power Supply
+
17577 - Disconnect and Remove All Utilities From Dark Light Power Supply
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17577]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17577]
  
#17575 - Remove LERF Vault Truck Ramp Gate
+
17575 - Remove LERF Vault Truck Ramp Gate
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17575]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17575]
  
#17574 - Remove Dark Light Solenoid Power Lead & Cable Tray
+
17574 - Remove Dark Light Solenoid Power Lead & Cable Tray
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17574]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17574]
  
#17573 - Rework Power in LERF for New LCLS2 Project
+
17573 - Rework Power in LERF for New LCLS2 Project
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17573]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17573]
  
#17539 - Remove waterflow equipment from the Darklight power supply/system (LERF)
+
17539 - Remove waterflow equipment from the Darklight power supply/system (LERF)
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17539]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17539]
  
#17537 - LERF Truck Ramp Shielding Block Removal
+
17537 - LERF Truck Ramp Shielding Block Removal
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17537]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17537]
  
#17535 - LERF UV Collimator and VUV Turning Can Removal
+
17535 - LERF UV Collimator and VUV Turning Can Removal
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17535]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17535]
  
#17533 - LERF/PSS IFIX Communication Investigation (System B)
+
17533 - LERF/PSS IFIX Communication Investigation (System B)
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17533]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17533]
  
LERF BLM Removal for Cryomodule and LCLS-II Support
+
17532 - LERF BLM Removal for Cryomodule and LCLS-II Support
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17532]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17532]
  
Vent-up & remove beam line LERF 4F region
+
17529 - Vent-up & remove beam line LERF 4F region
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17529]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17529]
  
LERF ODH System Certification
+
17528 - LERF ODH System Certification
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17528]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17528]
  
Disconnect LERF Trim Magnets For Cryomodule Removal
+
17527 - Disconnect LERF Trim Magnets For Cryomodule Removal
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17527]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17527]
  
Disconnect LERF bpms for Cryomodule removal
+
17518 - Disconnect LERF bpms for Cryomodule removal
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17518]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17518]
  
LERF WaveGuide Removal
+
17517 - LERF WaveGuide Removal
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17517]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17517]
  
LERF CM1F03 & 04 Removal
+
17516 - LERF CM1F03 & 04 Removal
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17516]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17516]
  
Secure Vacuum Cables for removal of 1F02 / 1F03 Cryomodules
+
17514 - Secure Vacuum Cables for removal of 1F02 / 1F03 Cryomodules
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17514]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17514]
  
LERF ODH ANNUAL CHANGE OUT 2017
+
17513 - LERF ODH ANNUAL CHANGE OUT 2017
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17513]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17513]
  
Verify LERF Klystrons are suitable for use in 1L13 for new C50
+
17440 - Maintenance of LERF PSS Run/safe Boxes
 +
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17440]
 +
 
 +
17416 - Verify LERF Klystrons are suitable for use in 1L13 for new C50
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17416]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17416]
  
LERF Module Drive high determination
+
17320 - LERF Module Drive high determination
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17320]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17320]
  
Q0 Improvement of cryomodule by In-situ Demagnetization
+
17177 - Q0 Improvement of cryomodule by In-situ Demagnetization
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17177]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17177]

Latest revision as of 10:51, 14 February 2019

18842 - Modify LERF LCLS-II Interlock Controls

18823 - LERF Gun HV checkout with activated photocathode

18804 - LERF LLRF Firm/Software Update 2

18803 - LERF LCLS-II Heater Protection Update

18783 - LERF LLRF Firm/Software Update

18770 - 30K Temp bump of LCLS-II CM in LERF Vault

18613 - LCLSII Transporting and Mat'l Handling

18537 - Move LCLS-ll cryomodule to position two

18346 - Air Lines LCLSII CG to Cryo Valves

18335 - Install Bellows Support Rail

18237 - LERF Single SSA Tests

18069 - Move LCLSII Cryo Module from Test Lab to LERF Vault

18177 - Cable Pull LCLS2

18007 - LCLSII SSA/HPA raised Floor

17923 - Installation of RF waveguide for two LCLS II Modules

17884 - LERF Waveguide Anchor Point Layout

17882 - Shut Down of Panel E-1000 in LERF

17881 - Alignment of FL02 LERF Cryomodule

17841 - LCLSII SSA Delivery & Setting Material Handling Support

17834 - Install LCLSII CM End Can

17831 - Install Wave Guide Supports and U-Tube Lifting Plates for LCLSII

17825 - Raise 2 Klystron Racks 2" & Install Al. Box Tube Spacers

17743 - ^LERF cryomodule shuffle

17689 - Prep FEL Girders 8F02, 8F03 and UV Happek for Removal From Beamline

17688 - Shut Down of Panel E1000 in LERF Gallery

17642 - Lerf beamline girder disconnects @ 1F02, 1F03 and 1F04

17628 - FL03 & 4 removal of HPA low level and CPS control power

17579 - Re-Assemble LERF GW Dipoles

17577 - Disconnect and Remove All Utilities From Dark Light Power Supply

17575 - Remove LERF Vault Truck Ramp Gate

17574 - Remove Dark Light Solenoid Power Lead & Cable Tray

17573 - Rework Power in LERF for New LCLS2 Project

17539 - Remove waterflow equipment from the Darklight power supply/system (LERF)

17537 - LERF Truck Ramp Shielding Block Removal

17535 - LERF UV Collimator and VUV Turning Can Removal

17533 - LERF/PSS IFIX Communication Investigation (System B)

17532 - LERF BLM Removal for Cryomodule and LCLS-II Support

17529 - Vent-up & remove beam line LERF 4F region

17528 - LERF ODH System Certification

17527 - Disconnect LERF Trim Magnets For Cryomodule Removal

17518 - Disconnect LERF bpms for Cryomodule removal

17517 - LERF WaveGuide Removal

17516 - LERF CM1F03 & 04 Removal

17514 - Secure Vacuum Cables for removal of 1F02 / 1F03 Cryomodules

17513 - LERF ODH ANNUAL CHANGE OUT 2017

17440 - Maintenance of LERF PSS Run/safe Boxes

17416 - Verify LERF Klystrons are suitable for use in 1L13 for new C50

17320 - LERF Module Drive high determination

17177 - Q0 Improvement of cryomodule by In-situ Demagnetization