Difference between revisions of "ATLis"

From LCLS-II testing
Jump to navigation Jump to search
Line 1: Line 1:
  
Lerf beamline girder disconnects @ 1F02, 1F03 and 1F04
+
#17642 - Lerf beamline girder disconnects @ 1F02, 1F03 and 1F04
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17642]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17642]
  
FL03 & 4 removal of HPA low level and CPS control power
+
#17628 - FL03 & 4 removal of HPA low level and CPS control power
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17628]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17628]
  
Re-Assemble LERF GW Dipoles
+
#17579 - Re-Assemble LERF GW Dipoles
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17579]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17579]
  
Disconnect and Remove All Utilities From Dark Light Power Supply
+
#17577 - Disconnect and Remove All Utilities From Dark Light Power Supply
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17577]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17577]
  
Remove LERF Vault Truck Ramp Gate
+
#17575 - Remove LERF Vault Truck Ramp Gate
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17575]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17575]
  
Remove Dark Light Solenoid Power Lead & Cable Tray
+
#17574 - Remove Dark Light Solenoid Power Lead & Cable Tray
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17574]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17574]
  
Rework Power in LERF for New LCLS2 Project
+
#17573 - Rework Power in LERF for New LCLS2 Project
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17573]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17573]
  
Remove waterflow equipment from the Darklight power supply/system (LERF)
+
#17539 - Remove waterflow equipment from the Darklight power supply/system (LERF)
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17539]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17539]
  
LERF Truck Ramp Shielding Block Removal
+
#17537 - LERF Truck Ramp Shielding Block Removal
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17537]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17537]
  
LERF UV Collimator and VUV Turning Can Removal
+
#17535 - LERF UV Collimator and VUV Turning Can Removal
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17535]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17535]
  
LERF/PSS IFIX Communication Investigation (System B)
+
#17533 - LERF/PSS IFIX Communication Investigation (System B)
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17533]
 
*[http://devweb.acc.jlab.org/CSUEApps/atlis/task/17533]
  

Revision as of 07:38, 11 October 2017

  1. 17642 - Lerf beamline girder disconnects @ 1F02, 1F03 and 1F04
  1. 17628 - FL03 & 4 removal of HPA low level and CPS control power
  1. 17579 - Re-Assemble LERF GW Dipoles
  1. 17577 - Disconnect and Remove All Utilities From Dark Light Power Supply
  1. 17575 - Remove LERF Vault Truck Ramp Gate
  1. 17574 - Remove Dark Light Solenoid Power Lead & Cable Tray
  1. 17573 - Rework Power in LERF for New LCLS2 Project
  1. 17539 - Remove waterflow equipment from the Darklight power supply/system (LERF)
  1. 17537 - LERF Truck Ramp Shielding Block Removal
  1. 17535 - LERF UV Collimator and VUV Turning Can Removal
  1. 17533 - LERF/PSS IFIX Communication Investigation (System B)

LERF BLM Removal for Cryomodule and LCLS-II Support

Vent-up & remove beam line LERF 4F region

LERF ODH System Certification

Disconnect LERF Trim Magnets For Cryomodule Removal

Disconnect LERF bpms for Cryomodule removal

LERF WaveGuide Removal

LERF CM1F03 & 04 Removal

Secure Vacuum Cables for removal of 1F02 / 1F03 Cryomodules

LERF ODH ANNUAL CHANGE OUT 2017

Verify LERF Klystrons are suitable for use in 1L13 for new C50

LERF Module Drive high determination

Q0 Improvement of cryomodule by In-situ Demagnetization