ATLis

From LCLS-II testing
Revision as of 06:33, 11 October 2017 by Jordan (talk | contribs)
Jump to navigation Jump to search

Lerf beamline girder disconnects @ 1F02, 1F03 and 1F04

FL03 & 4 removal of HPA low level and CPS control power

Re-Assemble LERF GW Dipoles

Disconnect and Remove All Utilities From Dark Light Power Supply

Remove LERF Vault Truck Ramp Gate

Remove Dark Light Solenoid Power Lead & Cable Tray

Rework Power in LERF for New LCLS2 Project

Remove waterflow equipment from the Darklight power supply/system (LERF)

LERF Truck Ramp Shielding Block Removal

LERF UV Collimator and VUV Turning Can Removal

LERF/PSS IFIX Communication Investigation (System B)

LERF BLM Removal for Cryomodule and LCLS-II Support

Vent-up & remove beam line LERF 4F region

LERF ODH System Certification

Disconnect LERF Trim Magnets For Cryomodule Removal

Disconnect LERF bpms for Cryomodule removal

LERF WaveGuide Removal

LERF CM1F03 & 04 Removal

Secure Vacuum Cables for removal of 1F02 / 1F03 Cryomodules

LERF ODH ANNUAL CHANGE OUT 2017

Verify LERF Klystrons are suitable for use in 1L13 for new C50

LERF Module Drive high determination

Q0 Improvement of cryomodule by In-situ Demagnetization