Lerf beamline girder disconnects @ 1F02, 1F03 and 1F04

FL03 & 4 removal of HPA low level and CPS control power

Re-Assemble LERF GW Dipoles

Disconnect and Remove All Utilities From Dark Light Power Supply

Remove LERF Vault Truck Ramp Gate

Remove Dark Light Solenoid Power Lead & Cable Tray

LERF Truck Ramp Shielding Block Removal

LERF CM1F03 & 04 Removal

Disconnect LERF Trim Magnets For Cryomodule Removal