ATLis
17642 - Lerf beamline girder disconnects @ 1F02, 1F03 and 1F04
17628 - FL03 & 4 removal of HPA low level and CPS control power
17579 - Re-Assemble LERF GW Dipoles
17577 - Disconnect and Remove All Utilities From Dark Light Power Supply
17575 - Remove LERF Vault Truck Ramp Gate
17574 - Remove Dark Light Solenoid Power Lead & Cable Tray
17573 - Rework Power in LERF for New LCLS2 Project
17539 - Remove waterflow equipment from the Darklight power supply/system (LERF)
17537 - LERF Truck Ramp Shielding Block Removal
17535 - LERF UV Collimator and VUV Turning Can Removal
17533 - LERF/PSS IFIX Communication Investigation (System B)
17532 - LERF BLM Removal for Cryomodule and LCLS-II Support
17529 - Vent-up & remove beam line LERF 4F region
17528 - LERF ODH System Certification
17527 - Disconnect LERF Trim Magnets For Cryomodule Removal
17518 - Disconnect LERF bpms for Cryomodule removal
17517 - LERF WaveGuide Removal
17516 - LERF CM1F03 & 04 Removal
17514 - Secure Vacuum Cables for removal of 1F02 / 1F03 Cryomodules
17513 - LERF ODH ANNUAL CHANGE OUT 2017
17416 - Verify LERF Klystrons are suitable for use in 1L13 for new C50
17320 - LERF Module Drive high determination
17177 - Q0 Improvement of cryomodule by In-situ Demagnetization