17831 - Install Wave Guide Supports and U-Tube Lifting Plates for LCLSII *[1]

17825 - Raise 2 Klystron Racks 2" & Install Al. Box Tube Spacers

17743 - ^LERF cryomodule shuffle

17689 - Prep FEL Girders 8F02, 8F03 and UV Happek for Removal From Beamline

17688 - Shut Down of Panel E1000 in LERF Gallery

17642 - Lerf beamline girder disconnects @ 1F02, 1F03 and 1F04

17628 - FL03 & 4 removal of HPA low level and CPS control power

17579 - Re-Assemble LERF GW Dipoles

17577 - Disconnect and Remove All Utilities From Dark Light Power Supply

17575 - Remove LERF Vault Truck Ramp Gate

17574 - Remove Dark Light Solenoid Power Lead & Cable Tray

17573 - Rework Power in LERF for New LCLS2 Project

17539 - Remove waterflow equipment from the Darklight power supply/system (LERF)

17537 - LERF Truck Ramp Shielding Block Removal

17535 - LERF UV Collimator and VUV Turning Can Removal

17533 - LERF/PSS IFIX Communication Investigation (System B)

17532 - LERF BLM Removal for Cryomodule and LCLS-II Support

17529 - Vent-up & remove beam line LERF 4F region

17528 - LERF ODH System Certification

17527 - Disconnect LERF Trim Magnets For Cryomodule Removal

17518 - Disconnect LERF bpms for Cryomodule removal

17517 - LERF WaveGuide Removal

17516 - LERF CM1F03 & 04 Removal

17514 - Secure Vacuum Cables for removal of 1F02 / 1F03 Cryomodules

17513 - LERF ODH ANNUAL CHANGE OUT 2017

17416 - Verify LERF Klystrons are suitable for use in 1L13 for new C50

17320 - LERF Module Drive high determination

17177 - Q0 Improvement of cryomodule by In-situ Demagnetization