User contributions
Jump to navigation
Jump to search
- 15:44, 6 October 2017 diff hist +98 N Reviews Created page with "[https://www.jlab.org/indico/event/233/ Review of LERF as Cryomodule Testing Facility for LCLS-II]"
- 15:42, 6 October 2017 diff hist +14 Main Page
- 15:31, 6 October 2017 diff hist -1 Schedules
- 15:29, 6 October 2017 diff hist +1 Schedules
- 15:29, 6 October 2017 diff hist +13 Schedules
- 15:28, 6 October 2017 diff hist +41 Schedules
- 15:21, 6 October 2017 diff hist -69 Images
- 15:20, 6 October 2017 diff hist +31 N File:Cm xline.JPG Transfer line connections to CM current
- 14:59, 6 October 2017 diff hist +216 Images
- 14:58, 6 October 2017 diff hist +23 N File:Cm center.JPG Center section of 2 CMs current
- 14:57, 6 October 2017 diff hist +1 Images
- 14:56, 6 October 2017 diff hist +72 Images
- 14:55, 6 October 2017 diff hist +49 N File:Cm 2.JPG Layout of 2 LCLS-II cryomodules in the LERF vault current
- 14:45, 6 October 2017 diff hist +55 Images
- 14:44, 6 October 2017 diff hist 0 Images
- 14:42, 6 October 2017 diff hist -26 Images
- 14:42, 6 October 2017 diff hist -2 Images
- 14:41, 6 October 2017 diff hist +43 N Images Created page with "200px|thumb|left|alt text"
- 14:40, 6 October 2017 diff hist +37 N File:Cm.JPG LCLS-II Cryomodule under construction current
- 14:38, 6 October 2017 diff hist 0 Main Page
- 14:37, 6 October 2017 diff hist +12 Main Page
- 15:47, 5 October 2017 diff hist +5 LERF Operations Directive (LOD) current
- 15:47, 5 October 2017 diff hist +44 N LERF Operations Directive (LOD) Created page with "*LERF_Operations_Directives_twosided.pdf"
- 15:46, 5 October 2017 diff hist -8 Main Page
- 15:46, 5 October 2017 diff hist +44 Main Page
- 15:45, 5 October 2017 diff hist +31 N File:LERF Operations Directives twosided.pdf LERF Operations Directive (LOD)
- 15:44, 5 October 2017 diff hist +2 Main Page
- 15:39, 3 October 2017 diff hist +3 LERF CryoControl CAPTAR
- 15:39, 3 October 2017 diff hist -17 LERF CryoControl CAPTAR
- 15:37, 3 October 2017 diff hist +15 N File:Cryo racks.png Cryo Rack Names current
- 15:34, 3 October 2017 diff hist +2 LERF CryoControl CAPTAR
- 15:33, 3 October 2017 diff hist 0 LERF CryoControl CAPTAR
- 15:32, 3 October 2017 diff hist +15 LERF CryoControl CAPTAR
- 15:30, 3 October 2017 diff hist +3 LERF CryoControl CAPTAR
- 15:28, 3 October 2017 diff hist +41 LERF CryoControl CAPTAR
- 15:26, 3 October 2017 diff hist +3 LERF CryoControl CAPTAR
- 15:25, 3 October 2017 diff hist +38 LERF CryoControl CAPTAR
- 15:24, 3 October 2017 diff hist +28 N File:CryoControl LERF Rack Names.pdf Cryo-control LERF rack names current
- 15:23, 3 October 2017 diff hist +18 LERF CryoControl CAPTAR
- 15:21, 3 October 2017 diff hist +1,145 N LERF CryoControl CAPTAR Created page with "email from 10/2/2017: Hi Kevin, Here are most of the cables we’ll need for the cryo control racks scope. I’m passing this example along so your team can take a look at wha..."
- 15:20, 3 October 2017 diff hist +28 N CAPTAR - Cable Layout Created page with "*LERF CryoControl CAPTAR"
- 15:19, 3 October 2017 diff hist +27 Main Page
- 15:12, 3 October 2017 diff hist +172 N Schedules Created page with "There is a scheduling meeting in the LERF break room every Wednesday at 11:00AM. The PDF of the MS project schedule is updated below as needed. *Scheduling White Board"
- 15:09, 3 October 2017 diff hist -13 Main Page
- 12:11, 3 October 2017 diff hist +11 Project Description
- 12:06, 3 October 2017 diff hist +7 Contacts →Project Lead – Kevin Jordan
- 12:05, 3 October 2017 diff hist +45 Main Page
- 09:41, 3 October 2017 diff hist +5 Main Page
- 09:08, 3 October 2017 diff hist +12 Main Page
- 09:07, 3 October 2017 diff hist -21 Main Page
- 09:06, 3 October 2017 diff hist 0 Main Page
- 09:02, 3 October 2017 diff hist +79 Cryomodule Waveguide Layout
- 09:00, 3 October 2017 diff hist +38 Cryomodule Waveguide Layout
- 08:59, 3 October 2017 diff hist +4 Cryomodule Waveguide Layout
- 08:59, 3 October 2017 diff hist +33 Cryomodule Waveguide Layout
- 08:52, 3 October 2017 diff hist +102 Contacts
- 08:49, 3 October 2017 diff hist -6 Contacts
- 08:48, 3 October 2017 diff hist +41 Contacts
- 08:47, 3 October 2017 diff hist -2 Contacts
- 08:46, 3 October 2017 diff hist +140 N Contacts Created page with " == Project Lead – Kevin Jordan Lead on SLAC Equip – Curt Hovater Lead Engineer – Joe Gubeli Work Coordinator – Jim Coleman =="
- 08:44, 3 October 2017 diff hist +4 E H S and Q
- 08:43, 3 October 2017 diff hist -5 E H S and Q
- 08:43, 3 October 2017 diff hist -27 E H S and Q
- 08:42, 3 October 2017 diff hist +84 E H S and Q
- 08:40, 3 October 2017 diff hist +156 E H S and Q
- 08:28, 3 October 2017 diff hist +42 N File:WG plan.png Plan view of 3-D model of waveguide layout current
- 08:27, 3 October 2017 diff hist +32 N File:WG iso.png 3-D model of waveguide in tunnel current
- 08:25, 3 October 2017 diff hist +1 Main Page
- 08:25, 3 October 2017 diff hist +5,605 N Project Description Created page with "PROJECT DESCRIPTION, OBJECTIVE, AND SCOPE The LCLS II Project at JLab is funded to lessen the testing backlog at the CryoModule Test Facility (CMTF) in the Test Lab. Two LCLS..."
- 08:24, 3 October 2017 diff hist +24 Main Page
- 08:23, 3 October 2017 diff hist +106 N E H S and Q Created page with "Repository for EHS&Q related documents file:Preliminary_Hazard_Analysis_LERF_for_LCLS-II_to_post.pdf "
- 08:20, 3 October 2017 diff hist +60 N Scheduling White Board Created page with " *[http://lerfboard.acc.jlab.org/ LERF White Board Schedule]" current
- 08:19, 3 October 2017 diff hist +6 Main Page
- 08:17, 3 October 2017 diff hist +34 EHS&Q current
- 08:16, 3 October 2017 diff hist +7 EHS&Q
- 07:55, 3 October 2017 diff hist +28 Main Page
- 07:54, 3 October 2017 diff hist 0 Main Page
- 07:41, 3 October 2017 diff hist -2 Main Page
- 07:40, 3 October 2017 diff hist +27 N File:Preliminary Hazard Analysis LERF for LCLS-II to post.pdf Preliminary Hazard Analysis current
- 07:33, 3 October 2017 diff hist +24 Facilities Documents
- 18:46, 2 October 2017 diff hist +2 Main Page
- 18:45, 2 October 2017 diff hist +1 Main Page
- 18:37, 2 October 2017 diff hist +1,070 Facilities Documents
- 18:29, 2 October 2017 diff hist +4 Facilities Documents
- 18:28, 2 October 2017 diff hist +5 Facilities Documents
- 16:31, 2 October 2017 diff hist +15 Facilities Documents
- 16:30, 2 October 2017 diff hist +39 N Egress Document Created page with "FEL Second Floor Gallery Egress.pdf" current
- 16:28, 2 October 2017 diff hist +20 N Facilities Documents Created page with "*Egress Document"
- 16:27, 2 October 2017 diff hist +26 Main Page
- 16:26, 2 October 2017 diff hist +116 N File:FEL Second Floor Gallery Egress.pdf Document from Christine Snetter 10/2/2017, describing that placement is OK 18” on the back and 48” to the front. current
- 16:19, 2 October 2017 diff hist +106 Main Page
- 16:09, 2 October 2017 diff hist +50 Main Page
- 16:06, 2 October 2017 diff hist 0 N File:D4903B12-6E5D-45E3-AA87-17E4985422A3.jpeg current
- 15:53, 2 October 2017 diff hist +34 N EHS&Q Created page with "*Preliminary Safety Assessment"
- 15:52, 2 October 2017 diff hist +2 Main Page
- 15:42, 2 October 2017 diff hist +20 N Cryomodule Waveguide Layout Created page with "Upstairs Downstairs"
- 15:39, 2 October 2017 diff hist +48 Main Page
- 15:34, 2 October 2017 diff hist +5 Main Page →Getting started
- 15:33, 2 October 2017 diff hist +7 Main Page
- 15:23, 2 October 2017 diff hist +38 N Talk:Main Page Created page with "LCLS-II Cryomodule Testing at the LERF" current