Difference between revisions of "PRad Experiment Readiness Review"

From Pcrewiki
Jump to navigationJump to search
Line 67: Line 67:
 
** [https://www.wiki.jlab.org/pcrwiki/ PRad Conduct of Operations (COO)]
 
** [https://www.wiki.jlab.org/pcrwiki/ PRad Conduct of Operations (COO)]
 
** [https://wiki.jlab.org/pcrewiki/images/b/bb/Osp.pdf PRad Experiment Safety Assesment Document (ESAD)]
 
** [https://wiki.jlab.org/pcrewiki/images/b/bb/Osp.pdf PRad Experiment Safety Assesment Document (ESAD)]
** [https://www.wiki.jlab.org/pcrwiki/ Radiation Safety Assesment Document (RSAD)]
+
** [https://wiki.jlab.org/pcrewiki/images/f/fa/RSAD_PRad_HallB_2015.pdf Radiation Safety Assesment Document (RSAD)]
 
** [https://www.jlab.org/Hall-B/run-web/hps/Hall-B_ERG.pdf Hall B Emergency Responce Guidelines (ERG)]
 
** [https://www.jlab.org/Hall-B/run-web/hps/Hall-B_ERG.pdf Hall B Emergency Responce Guidelines (ERG)]

Revision as of 17:16, 6 November 2015


The review will take place November 12, 2015 at 8:30 am in L102



Agenda

  • 8:30 Executive Session
  • 9:00 Physics goals of the PRad experiment (15 min) - Haiyan Gao
  • 9:15 Overview of the experimental setup, required beam parameters, alignment, HyCal, run plan (30 minutes) - Ashot Gasparian
    • [ Run plan]
  • 9:45 Coexistence with CLAS12 project, including discussion of schedule, manpower needs, service provider needs, and infrastructure requirements (30 min) - Eugene Pasyuk
  • 10:15 Coffee Break
  • 10:30 Target: parameters, safety (20 min) - Chris Keith
  • 10:50 GEM and DAQ integration (20 min) - Nilanga Liyanage
  • 11:10 DAQ, on-line and off-line software (20 min) - Chao Peng
  • 11:30 Engineering aspects: beam line, vacuum vessel, window, installation, safety (30 min) - Bob Miller
  • 12:00 PRad Beam Commissioning and Procedures (20 min) - Arne Freyberger
  • 12:20 Run documentation COO, ESAD, RSAD, etc. (30 min) - Dipangkar/Mahbub
  • 12:50 Lunch
  • 13:30 Executive Session
  • 15:30 Closeout

Materials for ERR

Presentations

Documentation