Difference between revisions of "ARC Energy Measurement"
Jump to navigation
Jump to search
m |
|||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
+ | [https://wiki.jlab.org/tegwiki/index.php/Installation_and_Commissioning <b> Back to Installation and Commissioning </b>] | ||
+ | |||
==== ARC Energy Measurement (DAY or SWING shift ONLY) ==== | ==== ARC Energy Measurement (DAY or SWING shift ONLY) ==== | ||
<ul> | <ul> | ||
Line 5: | Line 7: | ||
<li> We will not do a full dispersive measurement during this short run. | <li> We will not do a full dispersive measurement during this short run. | ||
</ul> | </ul> | ||
+ | |||
+ | <table border="1" style="width:80%"> | ||
+ | <tr> | ||
+ | <td>Energy of central ray (MeV)</td> | ||
+ | <td>Dispersive mode</td> | ||
+ | <td>Halog entry</td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>11000.00 </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td> 4400 </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td> 2200 </td> | ||
+ | <td> </td> | ||
+ | <td> </td> | ||
+ | </tr> | ||
+ | </table> |
Latest revision as of 18:35, 29 November 2017
Back to Installation and Commissioning
ARC Energy Measurement (DAY or SWING shift ONLY)
- The procedure will be conducted by Douglas Higinbotham.
- With the ARC in achromatic optics, the energy measurement can be done at any time.
- We will not do a full dispersive measurement during this short run.
Energy of central ray (MeV) | Dispersive mode | Halog entry |
11000.00 | ||
4400 | ||
2200 |