Run Meeting: February 15th, 2018

From Tritium Experiments Group
Jump to navigation Jump to search

Back to Main Page Daily_Run_Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

Summary of last 24h:

  • RF separator issue beginning of yesterday swing: 16:15 → 21:30.
  • Accelerator scheduled down time for today starting 9:00 (to restore the machine to a state were they could hopefully run all 4 halls smoothly at desired current) =>
  • Between those two events, collected 5 helium runs and 4 tritium runs.
  • Hall to go to controlled access around 10:00 am
  • A few mintues before that, raster RBX had failed => FIXED by Bill Gunning.
  • Work done by techs (Heidi, Andrew, Matt, Bob, Jack, Ethan):
    • Check temperature card for left arm ;
    • Check vacuum ;
    • Check nitrogen valve ;
    • Check Left Q1


Plan: take production data for kin15 and 16

Slides

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653

To join via Browser: https://bluejeans.com/372278653/browser