Difference between revisions of "Run Meeting: February 14th, 2018"
Jump to navigation
Jump to search
(One intermediate revision by one other user not shown) | |||
Line 3: | Line 3: | ||
4:00PM Run Meeting, Counting house meeting room (200C) | 4:00PM Run Meeting, Counting house meeting room (200C) | ||
− | Plan: take production data for kin15 and 16 | + | Summary of past 24h: |
+ | * Running pretty smoothly over the night. Interruptions due to Hall C tune-up + | ||
+ | current drop to 20 uA several times because of stability issues with beam delivery. | ||
+ | Accelerator interruption from 8:40 to 10 to an access to fix MO cooler in North Linac. | ||
+ | |||
+ | Plan: take production data for kin15 and 16. | ||
===Slides=== | ===Slides=== | ||
− | *Evan - Calibration Status Discussion | + | *Evan - Calibration Status Discussion [https://hallaweb.jlab.org/wiki/index.php/Analysis wiki table] |
BlueJeans connection info: | BlueJeans connection info: |
Latest revision as of 19:06, 16 February 2018
Back to Main Page Daily_Run_Meetings
4:00PM Run Meeting, Counting house meeting room (200C)
Summary of past 24h:
- Running pretty smoothly over the night. Interruptions due to Hall C tune-up +
current drop to 20 uA several times because of stability issues with beam delivery. Accelerator interruption from 8:40 to 10 to an access to fix MO cooler in North Linac.
Plan: take production data for kin15 and 16.
Slides
- Evan - Calibration Status Discussion wiki table
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653
To join via Browser: https://bluejeans.com/372278653/browser