Difference between revisions of "Run Meeting: February 21st, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
Line 21: Line 21:
 
===Slides===
 
===Slides===
  
 +
Tyler K [https://hallaweb.jlab.org/dvcslog/H3/180221_141522/calibration_methods.pdf Comparison of RHRS calibration methods]
  
 
BlueJeans connection info:
 
BlueJeans connection info:

Revision as of 15:05, 21 February 2018

Back to Main Page Daily_Run_Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

Summary of past 24h:

After the controlled access yesterday around 9:00am, during which the Hall A tech team successfully managed to swap the right Q1 power supply, we had a ESR issue that had both arms magnets trip. We recovered the LHRS at around 6:00pm, and the RHRS at around midnight. The data taking has been relatively smooth after 6:00pm, with a 2h beam off because of a IOC reboot on MCC side.

In spite of the DOE secretary visit, MCC will keep deliver beam during the whole day. Our plan is to keep taking data on both arms.


Plan: Production on Kin15 and Kin16


Near term special task: Optics: https://docs.google.com/spreadsheets/d/1pXUDzoSL6Y86r1mPVAdGJ_kS_1DGLkwGxH796TJKc-A/edit#gid=0

Slides

Tyler K Comparison of RHRS calibration methods

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653