Difference between revisions of "Run Meeting: February 28th, 2018"
Jump to navigation
Jump to search
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
4:00PM Run Meeting, Counting house meeting room (200C) | 4:00PM Run Meeting, Counting house meeting room (200C) | ||
+ | |||
+ | '''RC:''' Carlos Ayerbe | ||
==Summary of past 24h:== | ==Summary of past 24h:== | ||
− | + | '''Owl shift''' | |
+ | |||
+ | - took over He3 data taking for column 21/24 | ||
- There was an hour downtime due to Hall A laser problem. (~2:20am) | - There was an hour downtime due to Hall A laser problem. (~2:20am) | ||
Line 12: | Line 16: | ||
- Target was switched to H3 at 4:30. | - Target was switched to H3 at 4:30. | ||
+ | |||
+ | '''Day shift''' | ||
- Target changed to D2 ~10:40 | - Target changed to D2 ~10:40 | ||
- Target changed to He3 ~13:10 | - Target changed to He3 ~13:10 | ||
− | |||
==Plan:== | ==Plan:== |
Latest revision as of 15:47, 28 February 2018
Back to Main Page Daily_Run_Meetings
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Carlos Ayerbe
Summary of past 24h:
Owl shift
- took over He3 data taking for column 21/24
- There was an hour downtime due to Hall A laser problem. (~2:20am)
- Beam to Hall A was restored within an hour, around 3:20
- Target was switched to H3 at 4:30.
Day shift
- Target changed to D2 ~10:40
- Target changed to He3 ~13:10
Plan:
we are at Round VIII, column 22/24.
-Let's run it...
Slides
Tritium elog: https://hallaweb.jlab.org/dvcslog/H3/
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653