Difference between revisions of "Run Meeting: March 6th, 2018"
Jump to navigation
Jump to search
Line 17: | Line 17: | ||
Worst (but best) scenario: 3 weeks | Worst (but best) scenario: 3 weeks | ||
− | Plan: | + | ==Plan:== |
We are in restricted access. None of the magnets should be ramped up. There is a small margin to do it, but Jessie should be consulted. | We are in restricted access. None of the magnets should be ramped up. There is a small margin to do it, but Jessie should be consulted. | ||
Line 31: | Line 31: | ||
:Bob will install a new UPS for the network. | :Bob will install a new UPS for the network. | ||
+ | |||
+ | : I'd suggest Shujie to come to the morning early and midday MCC meeting. | ||
===Slides=== | ===Slides=== |
Latest revision as of 15:51, 6 March 2018
Back to:
4:00PM Run Meeting, Counting house meeting room (200C)
RC: Carlos Ayerbe
Summary of past 24h:
IS ANYBODY NOT AWARE?
Just in case, accelerator is down.
Min time: 3 days (but 1 pass) Estimated Max time: 2 weeks Worst (but best) scenario: 3 weeks
Plan:
We are in restricted access. None of the magnets should be ramped up. There is a small margin to do it, but Jessie should be consulted.
IF (big if) we get beam, it is expected for Friday.
TOMORROW:
- Ole will do some important computer maintenance at the counting house between 6am and approximately 9am
Note from Ole: " To do the switch, we have to log everyone out of all the counting house machines (adaq1/2, aonl1-4, adaqsc, compton). The machines will not have to be rebooted if all goes well, but some might."
- Bob will install a new UPS for the network.
- I'd suggest Shujie to come to the morning early and midday MCC meeting.
Slides
BlueJeans connection info:
To join the Meeting: https://bluejeans.com/372278653