Difference between revisions of "Run Meeting: April 6th, 2018"

From Tritium Experiments Group
Jump to navigation Jump to search
(Created page with "'''Back to:''' : Main Page : Daily Run Meetings 4:00PM Run Meeting, Counting house meeting room (200C) '''RC:''' Shujie Li [https://mi...")
 
 
(One intermediate revision by the same user not shown)
Line 11: Line 11:
 
==Status==
 
==Status==
 
*kin13/kin16 production in progress
 
*kin13/kin16 production in progress
* Hall B pass change
+
* 5th pass separator tripped a few times.
*BCM/Unser calibration
+
* Mike took an Unser calibration. Tried BCM calibration near the noon but beam was so trippy, gave up. Will try on Saturday when we have stable beam.
 +
* Hall A iocs lost connection around 1:50pm, requested an escort access to fix ups. System back online around 2:30pm.
 +
 
 +
https://logbooks.jlab.org/entry/3555964
 +
 
 +
 
 +
Thanks cryo group (Robert Norton!), Radcon, Jessie, Heidi and Hall A tech team for the fast response!
 +
* Hall B pass change from 3 to 5
  
 
==Slides==
 
==Slides==

Latest revision as of 14:46, 6 April 2018

Back to:

Main Page
Daily Run Meetings

4:00PM Run Meeting, Counting house meeting room (200C)

RC: Shujie Li

(shifts)

Status

  • kin13/kin16 production in progress
  • 5th pass separator tripped a few times.
  • Mike took an Unser calibration. Tried BCM calibration near the noon but beam was so trippy, gave up. Will try on Saturday when we have stable beam.
  • Hall A iocs lost connection around 1:50pm, requested an escort access to fix ups. System back online around 2:30pm.

https://logbooks.jlab.org/entry/3555964


Thanks cryo group (Robert Norton!), Radcon, Jessie, Heidi and Hall A tech team for the fast response!

  • Hall B pass change from 3 to 5

Slides


BlueJeans connection info:

To join the Meeting: https://bluejeans.com/372278653